Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

Concrete Penetrating Sealer
Infrastructure
Bidding
$6,000,000 CJ est. value
Tyndall, SD 57066

Concrete Penetrating Sealer
Infrastructure
Bidding
$6,000,000 CJ est. value
Tyndall, SD 57066

Road Materials
Term Contract
Post-Bid
SD

2022 Supplies and Services and Bridge Construction
Term Contract
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Asphalt Surface Treatment, Rout and Seal
Infrastructure
Bidding
$6,000,000 CJ est. value
Martin, SD 57551

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Last Updated 04/04/2023 01:38 AM
Project Title

SD44 - Missouri River Bridge (Platte/Winner) Replacement - South Dakota DOT

Physical Address View project details and contacts
City, State (County) Corsica, SD 57328   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $167,687,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of April 04, 2023, the project is in conceptual status. Anticipated Construction year is 2024. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents