Similar Projects
Marble Ridge PRS Improvements
Infrastructure
Results
$205,500 est. value
Reno, NV

2021 Sewer Maintenance, Repairs, & On-Call Services,
Term Contract
Results
$700,000 to $800,000 est. value
Reno, NV

2021 Sewer and Water Replacement Project
Infrastructure
Results
$2,500,000 est. value
Carson City, NV

McCarran International Airport Repair Grease Interceptors
Post-Bid
Las Vegas, NV 89121

Williams Avenue Utility Relocations at Centennial Parkway
Results
$350,000 to $380,000 est. value
Las Vegas, NV

Repair Grease Interceptors at Satellite Concourse D
Results
NV

Y1NZ--Construct Utility Loop - North Side Of Campus - 593-19-301
Demolition, Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
North Las Vegas, NV 89086

Y--Force Main Replacement
Post-Bid
Boulder City, NV

WRF Oxidation Ditch Repairs
Infrastructure
Results
$536,000 est. value
Henderson, NV 89011

Flamingo-Boulder Hwy North, Charleston-Maryland to Boulder Hwy and Maryland Pkwy System (Charleston-Maryland Storm Drain)
Results
$51,800,000 to $62,600,000 est. value
Las Vegas, NV 89121

Stead Sewer Capacity Project - Phase I
Results
Reno, NV

Sewer Lateral Warranty and Marketing Services
Post-Bid
Las Vegas, NV 89121

Fire Station 18 Sanitary Sewer Line Replacement
Results
$734,350 to $773,000 est. value
Las Vegas, NV 89119

Nellis Meadows Park Odor Control Feed Station
Results
$198,000 to $231,000 est. value
Las Vegas, NV 89121

Sanitary Sewer CIPP Lining-Fiscal 2022
Infrastructure
Results
Sparks, NV

Last Updated 09/17/2021 11:53 AM
Project Title

Collection System Metal Pipe Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,500,000 to $14,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 24,000 linear feet of cured-in-place-pipe within existing gravity sewer pipelines ranging in size from 6-inches to 15-inches, removal and replacement of approximately 300 linear feet of gravity sewer pipelines ranging in size from 8-inches to 15-inches, construction of approximately 400 linear feet of 8-inch diameter gravity sewer pipelines, installation/removal and replacement of 16 manholes ranging in interior diameter from 36-inches to 72 inches, and rehabilitation of 203 manholes. The work also includes rehabilitation of the existing Pebble Lift Station wet well. Construction also includes the relocation of water pipelines, removal of existing sanitary sewer pipelines and manholes, removal and replacement of street improvements, traffic control, dewatering, bypass pumping, and all other appurtenant work required to install/rehabilitate the proposed gravity sewer. The Site of the Work is located at: Various locations throughout the Las Vegas Valley.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents