Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Hunt Branch Trunk sewer - Phase 1
Infrastructure
Bidding
$3,100,000 CJ est. value
Springfield, MO 65806

Agricultural Innovation Hub, Darr Agricultural Center
New Construction, Infrastructure - 8,000 SF
Bidding
$4,000,000 CJ est. value
Springfield, MO 65807

2022 Campus Pavement Renewal
Infrastructure
Post-Bid
$200,000 est. value
Springfield, MO 65802

Shuyler Creek Trail Extension - City of Republic
Infrastructure
Post-Bid
$1,417,879 CJ est. value
Republic, MO 65738

Grading and Pavement for Phase 5 Republic Road, Grading and Pavement for Phase 4 Republic Road
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Springfield, MO 65814

Parking lot Improvements
Infrastructure
Results
$300,000 est. value
Battlefield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

Simply Smart Self Storage Facility
New Construction, Infrastructure - 18,500 SF
Pending Verification
$2,000,000 CJ est. value
Republic, MO 65738

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Last Updated 01/05/2024 05:32 PM
Project Title

Madison Avenue Site Improvements

Physical Address View project details and contacts
City, State (County) Strafford, MO 65757   (Greene County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $164,330 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes demolition of existing improvements, milling, asphalt overlay, storm sewer improvements, new concrete curb and gutter, new concrete sidewalk, new full depth asphalt, new stamped concrete, underground electric improvements, concrete bases for street lights and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The City of Strafford anticipates issuing notice to proceed in September 2022. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and , participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a tenhour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The City of Strafford hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The owner intends to award the contract to the most responsive, responsible bidder submitting the lowest bid. The owner reserves the right to reject any and all bids, and to waive any irregularities in the best interest of the owner. The City of Strafford anticipates issuing notice to proceed in March 2024.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents