Similar Projects
Phase II City of Evanston, Wyoming Avalon International Aluminum, LLC Facility
New Construction, Infrastructure - 64,245 SF
Bidding
$3,500,000 CJ est. value
Evanston, WY 82930

Phase II City of Evanston, Wyoming Avalon International Aluminum, LLC Facility
New Construction, Infrastructure - 64,245 SF
Bidding
$3,500,000 CJ est. value
Evanston, WY 82930

Installation of Chain Link Fencing and Gates
Infrastructure
Sub-Bidding
$10,000 CJ est. value
Evanston, WY 82930

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Domestic Water Piping Replacement Project
Alteration
Post-Bid
Evanston, WY 82930

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Avalon International Metal Building, Foundation, and Site Improvement Package
New Construction, Infrastructure
Post-Bid
Evanston, WY 82930

District 3 Crack Seal
Infrastructure
Results

18th, 19th, and West Summit Water Replacement Project
Infrastructure
Post-Bid
Evanston, WY

Bituminous Pavement Surfacing
Infrastructure
Results

Sage Street Water Replacement Project
Infrastructure
Post-Bid
Evanston, WY 82930

Mill and Overlay, Right-of-Way Fence Replacement
Infrastructure
Results

Street Maintenance Project
Infrastructure
Post-Bid
$400,000 est. value
Evanston, WY

Street Crack Seal Project - Summer 2022
Infrastructure
Results
Evanston, WY

Last Updated 08/06/2022 11:30 AM
Project Title

Construction of the Joy Lane Waterline Project

Physical Address View project details and contacts
City, State (County) Lyman, WY 82937   (Uinta County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $720,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following work: Install 200 of 6 pipe with associated fittings and valves. It also includes tying onto two other water lines with some asphalt patch. Each BIDDER will be required to submit, with his proposal, a certified check, or Bid Bond made payable without condition to the Bridger Valley Joint Powers Board in the amount of not less than five percent (5%) of the BIDDERs maximum Bid Price as guarantee that such BIDDER will enter into a contract within fifteen (15) days after the date of the OWNERs Notice of Award. Preference will be given to resident Wyoming Contractors in the amount of five percent (5%) of the low bid in accordance with Wyoming Statute 16-6-101, et. seq. Bridger Valley Joint Powers Board reserves the right to reject any or all bids or any part of any bid, to waive any formality in any bid, as its best interest may appear. Contractors are encouraged to visit the site prior to submitting bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents