Similar Projects
The French International School
Renovation - 180,000 SF
Design
Bethesda, MD 20814

Drew Freeman Middle School Replacement
New Construction - 144,800 SF
Design
Hillcrest Heights, MD

East Middle School
New Construction - 125,000 SF
Sub-Bidding
Westminster, MD 21157

William Wirt Middle School Replacement
New Construction, Renovation
Post-Bid
Less than $56,000,000 est. value
Riverdale, MD 20737

Glenridge Middle School
New Construction - 169,000 SF
Post-Bid
Less than $80,000,000 est. value
Hyattsville, MD 20784

Calvin M. Rodwell Elementary/Middle School
- 11,694 SF
Results
Baltimore, MD

On-Call Construction Management, Pre-Construction, and Construction Services
Term Contract
Results
Baltimore, MD

Saints Peter And Paul - Parish and School
New Construction
Construction
$18,000,000 est. value
Easton, MD 21601

The Country School Phase III
Renovation - 5,000 SF
Construction
Easton, MD 21601

Perkins Homes Redevelopment - Master Plan
New Construction
Pending Verification
$1,000,000,000 est. value
Baltimore, MD 21231

Chesterton Academy of St. Mary`s
New Construction
Pending Verification
Hollywood, MD

Kenmoor Middle School Replacement
New Construction - 144,800 SF
Design
Landover, MD

Construction Management at-Risk Services
Post-Bid
Rockville, MD 20850

C. Elizabeth Rieg Center - Limited Renovation
Renovation
Results
Mitchellville, MD 20716

Bowman Urban Educational Complex
New Construction - 53,995 SF
Construction
$18,700,000 est. value
Hagerstown, MD 21740

Reported 04/20/2021 02:12 PM
Project Title

Meade Senior High School Revitalization Project

Physical Address View project details and contacts
City, State (County) Fort Meade, MD 20755   (Anne Arundel County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced March 2021
Bids Due View project details and contacts
Estimated Value $142,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing high school is currently comprised of two buildings separated by a 2-hr fire wall. The addition to the west, completed in 2014 (Building 2), is code compliant and is proposed to remain so. The existing 1974 building (Building 1) fails to meet current life safety and building code standards of Allowable Area and Travel Distance. The quality of the 1974 building is that of IIB construction, Educational Occupancy, Multi-Story, and Sprinkled, which allows a maximum of 52,881 SF (per floor plate) including current frontage increases. The existing building area is 323,249 SF on two floors with its largest floorplate being 181,598 SF. In addition, the existing 1974 building length and width are such that occupants in certain central areas of the building cannot egress within the allowable travel distances. IBC requires 250’ and NFPA requires a maximum 200' travel distance, however current travel distances exceed 300' in places. Proposed Project: Renovate and expand to accommodate academic program needs Buildings 2, 3 & 4 are new additions and will be separated from the existing 1974 building (Building 1 on the plan diagram) with 2-hr fire walls featuring independent collapse. These new building additions will be fully complaint with IBC 2018. Building 1 (1974): We are proposing to renovate areas within the building and demolish and replace a portion of the 1974 building, refacing it to form a new secure and easily identifiable main entrance. As a result, Building 1 will be reduced to 277,890 SF on two stories from its current 323,249 SF. Bid #21CN-101, 2A Sitework Bid #21CN-102, 3A Concrete Bid #21CN-103, 4A Masonry Bid #21CN-104, 5A Steel Bid #21CN-105, 6A General works, Casework and Demolition Bid #21CN-106, 7A Roofing Bid #21CN-107, 8A Windows, Storefront and Curtainwall Bid #21CN-108, 9A Gypsum Walls, Ceiling and Painting Bid #21CN-109, 9C Flooring Bid #21CN-110, 15A Mechanical Plumbing, Fire Protection and Kitchen Bid #21CN-111, 16A Electrical

Details

1 Middle/Senior High School, 2 Stories Above Grade, Approximately 277,890 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents