Reported | 04/20/2021 02:12 PM |
Project Title | Meade Senior High School Revitalization Project |
Physical Address | View project details and contacts |
City, State (County) | Fort Meade, MD 20755 (Anne Arundel County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | |
Project Status | Construction Commenced March 2021 |
Bids Due | View project details and contacts |
Estimated Value | $142,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The existing high school is currently comprised of two buildings separated by a 2-hr fire wall. The addition to the west, completed in 2014 (Building 2), is code compliant and is proposed to remain so. The existing 1974 building (Building 1) fails to meet current life safety and building code standards of Allowable Area and Travel Distance. The quality of the 1974 building is that of IIB construction, Educational Occupancy, Multi-Story, and Sprinkled, which allows a maximum of 52,881 SF (per floor plate) including current frontage increases. The existing building area is 323,249 SF on two floors with its largest floorplate being 181,598 SF. In addition, the existing 1974 building length and width are such that occupants in certain central areas of the building cannot egress within the allowable travel distances. IBC requires 250’ and NFPA requires a maximum 200' travel distance, however current travel distances exceed 300' in places. Proposed Project: Renovate and expand to accommodate academic program needs Buildings 2, 3 & 4 are new additions and will be separated from the existing 1974 building (Building 1 on the plan diagram) with 2-hr fire walls featuring independent collapse. These new building additions will be fully complaint with IBC 2018. Building 1 (1974): We are proposing to renovate areas within the building and demolish and replace a portion of the 1974 building, refacing it to form a new secure and easily identifiable main entrance. As a result, Building 1 will be reduced to 277,890 SF on two stories from its current 323,249 SF. Bid #21CN-101, 2A Sitework Bid #21CN-102, 3A Concrete Bid #21CN-103, 4A Masonry Bid #21CN-104, 5A Steel Bid #21CN-105, 6A General works, Casework and Demolition Bid #21CN-106, 7A Roofing Bid #21CN-107, 8A Windows, Storefront and Curtainwall Bid #21CN-108, 9A Gypsum Walls, Ceiling and Painting Bid #21CN-109, 9C Flooring Bid #21CN-110, 15A Mechanical Plumbing, Fire Protection and Kitchen Bid #21CN-111, 16A Electrical |
||||||||||||||||||
Details | 1 Middle/Senior High School, 2 Stories Above Grade, Approximately 277,890 SF Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |