Similar Projects
Re-Roofing the Edgefield County Library
Post-Bid
Edgefield, SC

Polly Best Center Roof Replacement
Post-Bid
Less than $110,000 est. value
Barnwell, SC 29812

New Roof on Training Building
Results
Less than $27,950 est. value
Gaffney, SC 29340

Roofing Job
Results
$50,000 to $60,000 est. value
Cheraw, SC

BPH Roofing and Siding Repairs
Term Contract
Post-Bid
Columbia, SC

Admin Roof Replacement - John de la Howe School
Results
$400,000 to $500,000 est. value
McCormick, SC 29835

Brookland Lakeview Empowerment Center - CDBG Roof Replacement Project
Post-Bid
West Columbia, SC

Catawba Service Unit Roof Replacement
Results
$250,000 to $500,000 est. value
Rock Hill, SC 29730

Marion County Roofing Project for the Beeson Building
Post-Bid
Marion, SC 29571

St. James Elementary School (SJES) Roof Repair
Term Contract
Results
Myrtle Beach, SC

Roof Replacement
Post-Bid
Winnsboro, SC 29180

Z--Replace Roof-Historic LLS QTRS Building
Results
$50,000 to $100,000 est. value
Sullivan's Island, SC 29482

Roofing Supplies
Post-Bid
Columbia, SC

USC Aiken Etherredge Center Roof Repair
Results
$95,000 to $110,000 est. value
Aiken, SC

Basic Science Building Exterior Envelope Repairs - Roof
Post-Bid
$1,500,000 to $2,000,000 est. value
Charleston, SC 29425

Reported 11/11/2020 12:00 AM
Project Title

Re-Roofing the Edgefield County Administration and Archives Building

Physical Address View project details and contacts
City, State (County) Edgefield, SC   (Edgefield County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reroof the buildings with all new roofing material including, but not limited to: • Remove old coping metal and install new coping metal, • Install .50 mill Duro-last Duro fleece roof system with 15-year warranty • Install new HD Board • Flash up and over walls with .50 mil TPO • Remove and dispose of all debris. • Existing gutters and downspouts will remain in place • Include Material and Labor Warranty • Buildings will be operational during the construction and adequate safety measures must be taken to ensure employee and public safety for continued operations of the facilities

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents