Similar Projects
Job Order Contracts - Flooring Contracting Services
Alteration
Bidding
Redwood City, CA

City Hall North Wing Tile Replacement
Alteration
Bidding
Palm Desert, CA 92260

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

FEMA Region 9 Non-Static VCT Flooring
Term Contract
Results
Oakland, CA 94607

Orchard Dale Elementary School Modernization Project- Flooring
Alteration
Results
Whittier, CA 90603

Vinyl Flooring Installation and Repair
Alteration
Bidding
$100,000 est. value
Sacramento, CA

PKA - Bldg 665 & 664 LVT Flooring
Term Contract
Post-Bid
Travis AFB, CA

Riverside County Law Library Paint and Carpet Project
Alteration
Results
$500,000 est. value
Indio, Riverside, CA 92201

PKA - BLDG 243, 130, 942 LVT Flooring
Term Contract
Post-Bid
Travis AFB, CA

City Council Chambers Renovations
Alteration
Results
Palm Desert, CA 92260

Peralta Community College - Wide Deep Cleaning and Floor Waxing
Alteration
Post-Bid
Oakland, CA 94606

City Hall and CD Annex Carpet Replacement
Alteration
Results
Calimesa, CA 92320

O&M Basewide Carpet
Term Contract
Post-Bid
Fairfield, Travis AFB, CA 94534

Pka - Bldg 381 Carpet
Term Contract
Post-Bid
Fairfield, CA 94534

Last Updated 12/16/2021 09:23 AM
Project Title

Blackbox Stage Floor Replacement Costa Mesa High School

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92626   (Orange County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new dance floor at CMHS, approx.1600 sq/ft per plan. Contractor to install salvaged plywood (on site). Install new sleepers, insulation, moisture barrier, pads, hardboard, thresholds and base. Provide unit price for plywood, assume allowance of 30% plywood sheets will need to be replaced (credit for unused portion of allowance). Allowance and unit price must include all labor and materials.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents