Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Results
West Des Moines, IA 50266

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Homewood Suites by Hilton / Urbandale
New Construction, Infrastructure - 61,200 SF
Pending Verification
$18,000,000 CJ est. value
Urbandale, IA 50322

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 02/26/2023 12:31 AM
Project Title

Walnut Creek Floodgates Repair

Physical Address View project details and contacts
City, State (County) West Des Moines, IA 50265   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $752,290 [brand] Estimate
Plans Available from Structural Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Near the intersection of Grand Avenue and 63rd street in West Des Moines Description: The Walnut Creek Floodgates Repair includes the furnishing of labor and materials for the repairs to the flood protection structures. The repairs consist of surface preparation and painting to all painted steel elements, the drilling of drain holes, partial removal and replacement of the steel deck floodgates, the removal and replacement of the overhead gate rubber seals, along with traffic control, miscellaneous maintenance items, and adjustments. Some of the work shown on the construction documents will be performed by the City and is shown for reference only. The project is located near the intersection of Grand Avenue and 63rd street in West Des Moines Iowa. Work on said project may commence any time after the written notice to proceed and shall be completed by July 31st, 2024 *At the above time and place all bids received by the City will be opened and publicly read with the results being reported to the West Des Moines City Council at their meeting on Monday, March 6th, 2023 at 5:35 p.m at which time the Council may take action on the proposals submitted or at such time as may then be fixed. The City of West Des Moines is proposing a project to repair the Walnut Creek floodgates on Grand Avenue near Iowa 28, and on Iowa 28 near Ashworth Road. The repairs consist of surface preparation and painting to all painted steel elements, the drilling of drain holes, partial removal and replacement of the steel deck floodgates to match the profile at the sill, the removal and replacement of the overhead gate rubber seals, and Attached to this plan is a vicinity map showing the Walnut Creek floodgate locations and a detail sheet showing the floodgate repairs.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents