Similar Projects
Waste Water Lift Station Pump and Grinder Replacement
Renovation
Bidding
Black Hawk, CO 80422

Piney Creek Lift Station Upgrades
Renovation
Bidding
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

Repair Sewage Lift Station, Peterson AFB
Post-Bid
Colorado Springs, CO 80914

Insert for 200A Terminal Bushing Well
Post-Bid
Fort Collins, CO 80522

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Ritoro Operations Building and Wells A-2 and D-2 Project
New Construction, Infrastructure
Construction
$2,100,000 est. value
Elizabeth, CO 80107

Non - Potable Irrigation Pump Stations for Water and Sewer Department
New Construction
Bidding
Greeley, CO 80631

Arapahoe Aquifer Well Drilling Project
Post-Bid
Monument, CO 80132

Proposals Ashcroft Draw Lift Station
Results
Greeley, CO 80631

Arapahoe Well A-10 Casing Repair Project
Infrastructure
Bidding
CO

2021 Planned Well Rehabilitation and Well Abandonment / Denver Basin Aquifer Wells
Post-Bid
Castle Rock, CO

BLM-CO-NWD - CRV FO - Greenhorn Water Well
Results
Gypsum, CO

Avon Drinking Water Facility Chemical Feed Upgrades
Post-Bid
Vail, CO

Last Updated 11/23/2021 05:23 PM
Project Title

Dayton Well Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80112   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes demolishing the existing, below-ground pump station and pipe infrastructure; constructing a new, above-ground pump station building; installing and configuring the booster pumps; relining two existing, underground steel storage tanks; reconfiguring the distribution pipe infrastructure; constructing an irrigation booster pump at Tommy Davis Park; and improving the irrigation and landscaping at the Dayton Well site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents