Similar Projects
Marquette University School of Business and Innovation
New Construction
Design
$60,000,000 est. value
Milwaukee, WI 53233

Karrmann Library HVAC System & Skylight Replacement - GC
Bidding
$3,600,000 est. value
Platteville, WI

Veterinary Medicine - GPC
Renovation, Addition
Bidding
Less than $94,500,000 est. value
Madison, WI 53706

Building L (Centennial Hall, Fitness & Testing Centers) Interior Remodel
Post-Bid
Cleveland, WI 53015

New CDIS Building
New Construction, Addition
Post-Bid
$150,000,000 est. value
Madison, WI 53715

UW Research Lab Room 5018
Renovation
Results
Less than $171,000 est. value
Madison, WI 53705

Custodial Offices Relocation
Results
$160,000 est. value
Oshkosh, WI 54901

Engineering Technology and Electronic Media Lab - GC
Renovation
Bidding
$4,000,000 est. value
Green Bay, WI 54311

Oshkosh Campus Monument Signs
Post-Bid
Oshkosh, WI

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Engineering Technology and Electronic Media Lab - MEP
Renovation
Bidding
$4,000,000 est. value
Green Bay, WI 54311

Manufacturing Education Fab Lab
Addition - 9,950 SF
Post-Bid
Eau Claire, WI 54703

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

Classroom Remodel and AV System Upgrade
Renovation
Bidding
Appleton, WI 54914

Northeast Technical College Outdoor Storage Rack
Post-Bid
Green Bay, WI 54303

Last Updated 12/19/2020 01:40 AM
Project Title

Multi-Building Elevator Renovation - General

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54901   (Winnebago County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,330,400
Plans Available from State Agency - 10/30/20
Owner View project details and contacts
Architect View project details and contacts
Description

Kolf Sports Center: Elevator & Air Handling Units Replacement. The work includes removing the elevator, expanding and reconstructing the elevator shaft to accommodate a larger cab size that will more adequately serve the needs of the facility. In order to accommodate the larger elevator shaft size, three air handling units in an adjacent mechanical room will be removed and replaced with one air handling unit with variable air volume boxes. An existing roof mounted condenser and non functioning indoor chiller evaporator will be removed. Campus chilled water piping will be extended from Taylor Hall into Kolf Polk Library: Elevator Replacements. The work includes replacing two existing passenger hydraulic elevators, including the hydraulic cylinders, with new double bottom cylinders with PVC piping, controllers, pumping units, fixtures and door equipment. The elevator cabs will be rebuilt, and all elevator cab surfaces will be replaced; or the cabs will be replaced entirely. The work includes partitioning a portion of an existing space into a new code compliant elevator machine room in the lower level for the north elevator as well as code required upgrades to 1 plumbing, HVAC and electrical systems serving the elevators.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents