Similar Projects
Pool Service and Maintenance at North Natomas Community Center and Aquatic Complex
Infrastructure
Post-Bid
Sacramento, CA 95833

India and Beech Residential Tower
New Construction - 11,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92101

The Pool and Water Filter System Maintenance
Infrastructure
Post-Bid
Stockton, CA 95207

Johnston Pool Resurfacing
Alteration
Results
$231,750 est. value
Sacramento, CA 95815

Pool Replastercity Project
Alteration
Bidding
$270,000 est. value
Costa Mesa, CA 92626

Z--DEVA - Cow Creek Swimming Pool Repairs
Alteration
Results
$100,000 to $250,000 est. value
Death Valley, CA

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

Pool Heater Construction Services
Alteration
Bidding
Riverside, CA 92503

Mangan Pool Resurfacing
Alteration
Results
$247,170 est. value
Sacramento, CA 95822

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Downtown Aquatic Center Pool Re-Plastering Project
Alteration
Bidding
$270,000 est. value
Costa Mesa, CA 92626

AC Hotel by Marriott
New Construction
Design
Sherman Oaks, CA 91403

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

2211 S Western Avenue Mixed Use Development
New Construction, Build-Out, Infrastructure
Pending Verification
$30,000,000 est. value
Los Angeles, CA 90018

Last Updated 10/22/2021 08:01 AM
Project Title

RAC Slide Procurement and Install Project

Physical Address View project details and contacts
City, State (County) Roseville, CA 95747   (Placer County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $270,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the base bid includes: labor, materials, equipment, and engineering to furnish and install one outdoor body flume ride inclusive of fiberglass flume components, flume support system, starting platform with shade structure, stair, railing, and steps, and concrete footings and foundations. Removal of existing pool slide and associated piping, removal and replacement of water play structure and associated piping, pool deck modifications, removal and replacement of existing pool and water play structure equipment, and replaster of existing recreation pool shall be by separate contract.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents