Similar Projects
Bogie Lake North Sanitary Sewer S.A.D.
Post-Bid
White Lake, MI

HSE Septic Project 2
Infrastructure
Post-Bid
Ortonville, MI 48462

Catch Basin/Storm Drain Cleaning/Maint
Term Contract
Results
MI

Septic Disposal
Results
Commerce, Davisburg, Highland, Holly, Leonard, Ortonville, Walled Lake, Wixom, MI 48367

Hulbert Sanitary Sewers S.A.D. and Oak Ridge Sanitary Dewer S.A.D.
Infrastructure
Post-Bid
White Lake, MI

North Interceptor East-Arm PCI-4 Rehabilitation Contract No-1
Results
Waterford, MI 48328

Novi Trunk Sewer Rehabilitation
Infrastructure
Post-Bid
$1,900,000 est. value
Waterford, MI

2020 Sewer Cleaning and Televising
Results
Lathrup Village, MI

South Evergreen Interceptor Rehabilitation
Infrastructure
Post-Bid
Waterford, MI

2020 Sewer Lining Program
Results
Birmingham, MI

Pontiac Area 3 Sewer System Upgrade
Infrastructure
Post-Bid
$2,400,000 est. value
Waterford, MI

2020 Sewer Cleaning and Televising
Results
Troy, MI

Saw Sanitary Sewer Cleaning and Televising
Results
Bloomfield Hills, MI 48303

2020 Street Sweeping, Sewer Inspection, Cleaning and Repair
Term Contract
Results
Wixom, MI

Big Beaver Relief Sewer
Results
Less than $4,000,000 est. value
Troy, MI

Last Updated 12/29/2021 03:56 PM
Project Title

Porters Lane Emergency Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) Bloomfield Hills, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new 16” diameter, ductile iron pipe sanitary sewer and one sanitary manhole structure supported on timber piles to replace the existing pile-supported sanitary sewer. Approximate length of new sewer is 321 feet, and includes fabrication of cradle support system, continuous by-pass pumping of sanitary sewerage during project, and reconnection of 3 sanitary sewer services. 67 timber piles, including two test piles, are proposed to be driven to an average depth of 45 feet below the sewer. Install new 12” diameter, HDPE water main by horizontal direction drilling and open-cut methods to replace the existing water main. Approximate length of new water main is 336 feet, and includes installation of 1 fire hydrant, 2 new gate valves & wells, and reconnection of 4 water services. This project shall include all pavement restoration, surface restoration, traffic control, soil erosion control and other miscellaneous items necessary to complete the work as indicated on the Plans and Specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents