Similar Projects
The Kenosha Innovation Neighborhood
New Construction
Conception
$1,000,000,000 est. value
Kenosha, WI 53140

East Verona Avenue / Ice Arena
Addition - 39,990 SF
Design
$17,000,000 est. value
Verona, WI 53593

Roof Replacement For South Hall A And Lobby - 643 - City Of La Crosse
Renovation
Conception
$700,000 CJ est. value
La Crosse, WI 54601

Womens Volleyball Team Room Construction
New Construction, Infrastructure - 583 SF
Bidding
$140,000 CJ est. value
Oshkosh, WI 54901

Roger Harring Stadium Elevator Replacement - General
Renovation
Results
$675,000 est. value
La Crosse, WI 54601

Wilson Ice Arena Dasher Boards
Renovation
Post-Bid
Milwaukee, WI 53221

Camp Randall Stadium South End Zone Renovation
Renovation
Results
Madison, WI 53711

KB Willett Ice Arena Building Additions and Recladding and Goerke Park Recladding and Ticket Booth/Entryways
Addition, Demolition, Renovation, Infrastructure
Bidding
$350,000 CJ est. value
Stevens Point, WI 54481

Little Chute High School Mustang Multi-Purpose Turf Stadium
Renovation - 97,815 SF
Post-Bid
Little Chute, WI

3 Boilers for the La Crosse Center - 760 - City of La Crosse
Renovation
Conception
$750,000 CJ est. value
La Crosse, WI 54601

The Opportunity Center
New Construction, Infrastructure - 300,000 SF
Pending Verification
$80,000,000 CJ est. value
Milwaukee, WI 53209

Last Updated 09/14/2022 01:34 AM
Project Title

Restroom Remodeling In South Facility - 540 - City Of La Crosse

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54601   (La Crosse County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodeling of 10 bathrooms in the South Facility of the La Crosse Center. This includeds bathrooms in the South Hall, Lobby and Ballroom areas. Plumbing, grab bars, painting, heat registers, sinks, partitions/dividers, tile, pressure washing and demo are all part of the project. As of September 14, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents