Similar Projects
Clearwater Multimodal Transit Center
New Construction - 75,000 SF
Conception
$34,000,000 est. value
Clearwater, FL 33757

Port St. Lucie Intermodal Facility
New Construction
Conception
FL

Ground Transportation Center Project
New Construction
Design
Sarasota, FL 34243

Jacksonville Shipyards Mixed-Use Phase 1
New Construction, Renovation - 6,500 SF
Design
$321,000,000 est. value
Jacksonville, FL 32202

Construct Baggage Claim Expansion at Destin-Fort Walton Beach Airport
Renovation
Bidding
$10,000 est. value
Eglin AFB, FL 32542

Airside Concourse
Renovation
Bidding
$350,000 est. value
Orlando, FL 32827

FL Keys Marathon Airport Non-Aeronautical Use Building (EOC)
- 23,000 SF
Post-Bid
Marathon, FL

Monroe County Key West International Airport Concourse A and Terminal Improvements Program
Post-Bid
Key West, FL 33040

Design/Build Firms for the Buildout of STC Airline and Tenant Spaces Program
Build-Out
Results
Orlando, FL 32827

Construction of Satellite Concourse "C" at VPS
Results
Eglin AFB, FL 32542

Greyhound Bus Terminal - Permanent Location
New Construction - 12,000 SF
Construction
$1,300,000 est. value
Daytona Beach, FL 32114

MSC PortMiami
New Construction
Construction
$300,000,000 est. value
Miami, FL

Lilium Vertiports
New Construction
Pending Verification
Orlando, FL

Ferry Expansion
New Construction
Pending Verification
Redwood City, San Francisco, CA - Mission Bay, FL 94158

Rehabilitation of the South Apron - AIR - 5 - City of Winter Haven
Renovation
Conception
$4,780,110 est. value
Winter Haven, FL 33881

Reported 07/08/2022 12:00 AM
Project Title

Airsides A and E Security Screening Checkpoint Expansion

Physical Address View project details and contacts
City, State (County) Tampa, FL 33607   (Hillsborough County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $4,661,871
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope will significantly improve the circulation, queuing, and screening throughout in both airsides while also bringing the spaces up to current TSA standards. Airside A is 27,500 gsf and Airside E 33,500 gsf. Construction on the project will be completed while the airsides remain fully operational. Suffolk is working closely with the airport to develop and implement a phasing plan which will minimize the impact to existing operations and passengers.

Details

Airline/Passenger Terminal, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents