Similar Projects
Last Updated | 10/03/2022 12:01 PM |
Project Title | Phase II North Beach Outfall Removal & Water Quality Project - 22V26 - City of Naples |
Physical Address | View project details and contacts |
City, State (County) | Naples, FL 34102 (Collier County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $15,500,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City owns and maintains old outfall pipes along Naples Beaches that discharge stormwater directly onto the shoreline of the Gulf of Mexico within the recreational swim area. FDEP requires that this system be improved in a way that removes pipes and the discharge of stormwater from the beach and shoreline. This CIP transitions the existing northern four stormwater shoreline discharges into a single, offshore discharge that integrates a pump station to be located on an easement over the Naples Beach & Golf Course property. The new drainage system will incorporate numerous water quality improvement components. The design reduces flooding, improves water quality, sea turtle habitat, lateral beach access, and reduces beach erosion. It also protects the public from contact with the pipes and discharge water on at the shoreline. A separate $5 million has been budgeted for this project from one-cent sales tax revenue has been dedicated to this project. As of September 27, 2021, this project is included in the City of City of Naples FY 2024-2027. Information regarding design firm and general contractor selection timeline has not been released. The design and firm construction timeline have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |