Similar Projects
1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

Lantern Lane Improvements - 22V11 - City of Naples
Infrastructure
Conception
$310,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Resurfacing - SR 90 (US 41)
Infrastructure
Bidding
$3,367,086 CJ est. value
Ochopee, FL 34141

Resurfacing - SR 90 (US 41)
Infrastructure
Bidding
$3,367,086 CJ est. value
Ochopee, FL 34141

Sanders Residence
New Construction, Infrastructure - 3,740 SF
Sub-Bidding
$400,000 CJ est. value
Naples, FL 34110

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Master Pump Station 302.00 Site Improvements
Alteration
Post-Bid
$2,085,000 est. value
FL

Lowdermilk Park - ATV Storage Building - Re-Bid
New Construction, Infrastructure - 9,000 SF
Results
$359,530 CJ est. value
Naples, FL 34102

Utilities Repair and Maintenance Contractor Library
Infrastructure
Results
Naples, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Unidos Restaurant
Renovation, Infrastructure - 5,625 SF
Pending Verification
$150,000 CJ est. value
Naples, FL 34102

Fleischmann Park Playground Replacement - 23G09 - City of Naples
Infrastructure
Conception
$800,000 CJ est. value
Naples, FL 34102

Last Updated 10/03/2022 12:01 PM
Project Title

Phase II North Beach Outfall Removal & Water Quality Project - 22V26 - City of Naples

Physical Address View project details and contacts
City, State (County) Naples, FL 34102   (Collier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $15,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City owns and maintains old outfall pipes along Naples Beaches that discharge stormwater directly onto the shoreline of the Gulf of Mexico within the recreational swim area. FDEP requires that this system be improved in a way that removes pipes and the discharge of stormwater from the beach and shoreline. This CIP transitions the existing northern four stormwater shoreline discharges into a single, offshore discharge that integrates a pump station to be located on an easement over the Naples Beach & Golf Course property. The new drainage system will incorporate numerous water quality improvement components. The design reduces flooding, improves water quality, sea turtle habitat, lateral beach access, and reduces beach erosion. It also protects the public from contact with the pipes and discharge water on at the shoreline. A separate $5 million has been budgeted for this project from one-cent sales tax revenue has been dedicated to this project. As of September 27, 2021, this project is included in the City of City of Naples FY 2024-2027. Information regarding design firm and general contractor selection timeline has not been released. The design and firm construction timeline have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents