Similar Projects
Sidewalk Improvements - Chatham Parks
Infrastructure
Bidding
$280,000 est. value
Chatham, IL

Repair/Resurface Roadways and Sidewalks
Infrastructure
Bidding
$7,000,000 est. value
Springfield, IL 62702

Underground Parking Ramp Coating
Infrastructure
Post-Bid
Springfield, IL

Chatham Road Overlay - Lelend Grove
Infrastructure
Post-Bid
Springfield, IL

Repair/Resurface Roadways and Sidewalks
Results
Less than $2,500,000 est. value
Springfield, IL

FY2022 Sidewalk Program
Results
Springfield, IL

High School Parking Lot Maintenance Project
Infrastructure
Bidding
$2,000,000 est. value
Riverton, IL

Parking Consolidation Zone 2
Infrastructure
Post-Bid
Springfield, IL

CWLP Traffic and Metering Lot Replacement
Term Contract, Infrastructure
Results
Springfield, IL 62703

Resurface POV Parking Lot Around Building 2
Infrastructure
Post-Bid
Less than $1,500,000 est. value
Springfield, IL 62702

Removal and Replacement of a Portion of the Existing Parking
Infrastructure
Results
Springfield, IL

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

Repair/Resurface Roadways and Sidewalks
Infrastructure
Results
Less than $3,000,000 est. value
Springfield, IL 62702

FY2023 Bituminous Improvements
Infrastructure
Post-Bid
Springfield, IL

Upgrade Parking Lot/Site Lighting
Infrastructure, Alteration
Results
Less than $800,000 est. value
Springfield, IL 62703

Last Updated 06/13/2022 12:06 PM
Project Title

Material Proposal 2022 Seal Coat

Physical Address View project details and contacts
City, State (County) Auburn, IL   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

It is understood and agreed that the "Standard Specifications for Road and Bridge Construction" adopted 1/01/2012 and the "Supplemental Specifications and Recurring Special Provisions", adopted 1/01/2012 prepared by the Department of Transportation, shall govern insofar as they may be applied and insofar as they do not conflict with the special provisions and supplemental specifications attached hereto. It is understood that the quantities listed are approximate only and they may be increased or decreased as needed to properly complete the improvements within its present limits, at the stated unit price. - Delivery in full or partial loads shall be delivered within the time frame specified in the special provision. Delivery on job site refers to any place or road that the awarding authority designates. - Materials shall be priced in a price per gallons method. - All bidders must supply proof of adequate liability insurance for a bid to be considered. - All bidders must conform to the State of Illinois Prevailing Wage requirements. - All bidders must supply a schedule of availability prior to being awarded a contract. The materials to be bid upon are: 36,000 gallons of HFRS-2 emulsion - Bidder must be able to arrive at jobsite no later than 5:30 am to begin loading distributor, and ready to spread oil by 6 am. - Bidder must have equipment capable of spreading 10 feet in one pass. - The winning bidder will not be allowed to charge demurrage. - Winning bidder will contact Highway Commissioner and schedule the dates. - Winning bidder must be able to bring partial loads as needed by the Township. The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents