Project Title | Hurricane Sally Repairs at Bellview Fire Station |
Physical Address | View project details and contacts |
City, State (County) | Pensacola, FL 32526 (Escambia County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This contract is to remove and replace the herein specified damaged components located at the Bellview Fire Station, 7009 Pine Forest Rd, Pensacola, FL 32525. It is the responsibility of the Contractor to fully investigate the existing conditions and scope recommendations associated with this project prior to submitting a bid. The Contractor shall protect the building components and surrounding property from any damage directly or indirectly related to the construction activities and provide all construction barriers required by this work to protect the Contractors and Escambia Countys property and personnel. The Contractors bid shall include, but not be limited to, mobilization, safety, overhead equipment, materials installation equipment, personnel, and profit fees to perform the work described Due to the anticipated delay in production, and delivery, of certain construction materials required to complete this project, if manufacturing and delivery of construction materials is greater than 30 days, the Contractor shall provide written notification from the manufacturer and request a change order to the contract time. Work shall be completed within 30 calendar days. The Bellview Fire Station building site encompasses an approximate 16,500 square foot footprint. It is a two (2) story structure visible from Pine Forest Rd. The external building façade was observed to be corrugated metal panel siding and fiber cement board siding around the front porch area. The building has one main parking lot/drive way for vehicle parking, ingress, and egress. There are four (4) large commercial roll-up doors on the South side of the building -presumably for emergency vehicle ingress and egress. Three (3) aluminum framed doors were noted along the exterior of the building; one at the front of the fire station for general public access and two at the side of the building for personnel access to the vehicle bays. The roof is a gabled corrugated metal R-panel roof over bagged insulation directly fastened to structural steel framing. The interior is broken up into two (2) separate sections - vehicle cargo bay and living areas. The personnel areas (kitchen, living quarters, and common rooms) have typical interior finishes such as painted gypsum wallboard, suspended ceiling grid systems with batt insulation, vinyl tile floors and rubber wall base molding. |
||||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 16,500 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |