Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Service Contract for Heating, Ventilating, Air Conditioning and Temperature Controls
Term Contract
Post-Bid
Calumet City, IL 60409

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Boiler 1 And 3 At Dusable High School
Post-Bid
Chicago, IL 60615

Last Updated 10/11/2021 03:16 PM
Project Title

Building D Rotunda Baseboard Heat

Physical Address View project details and contacts
City, State (County) Arlington Heights, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 20 percent aspirational goal on the Contract. The Work consists of but is not limited to the following: 1. Provide and install individual control valves for each perimeter classroom, conference room, and south perimeter offices. Modify control sequence as required to incorporate control valves for space temperature control in heating mode. 2. Provide and install ceiling mounted occupancy sensors for all areas served by fan coil units. Occupancy sensors to be wired directly to BMS and replace non-functioning BACNet link with lighting controller. Modify sequence as required. 3. Calibrate all CO2 sensors and adjust minimum airflow rates for each zone. Modify control sequence as required. 4. Modify office group control sequences to include baseboard control, based on average space temperature with minimum and maximum limits. 5. Correct VAV graphics for all VAV serving fan coil units total. 6. Modify cool down and heat up control sequence. 7. Modify global fin tube sequence.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents