Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Design
West Glacier, MT 59936

Lewis and Clark State Park Comfort Station Septic
Infrastructure
Bidding
$466,000 est. value
Whitehall, MT

Environmental Professional Services
Term Contract
Bidding
$300,000 est. value

Construction of Park Avenue Sewer Main Extension
Infrastructure
Post-Bid
Stevensville, MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Post-Bid
Poplar, MT 59255

United States Environmental Protection Agency's (EPA) Region 8 Contracting
Results
Less than $136,000,000 est. value

United States Environmental Protection Agency's (EPA) Region 8 Contracting
Results
Less than $136,000,000 est. value

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Bidding
MT

Crowley Building Abatement Project
Demolition
Post-Bid
Lewistown, MT 59457

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Bidding
MT

Removing and Replacing 9 Sewer Manholes
Infrastructure
Post-Bid
Helena, MT

Environmental Consulting Service for Clean-Up Project
Alteration
Results
Libby, MT 59923

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Bidding
Silver Star, MT 59751

Reported 12/02/2021 12:00 AM
Project Title

HRDC Community First Griffin Place Site and Infrastructure

Physical Address View project details and contacts
City, State (County) State-Wide: MT
Category(s) Environmental, Heavy and Highway, Sewer and Water
Sub-Category(s) Hazardous Waste Disposal, Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed site grading work generally includes clearing, grubbing, tree and debris removal, topsoil stripping, stockpiling and haul off, cut and fill to subgrade, retention basin grading, and the installation and maintenance of SWPPP BMP’s. The proposed site utility work generally includes installation of approximately 340 lineal feet of 8-inch sanitary sewer main, 800 lineal feet of 8-inch water main, and 1082 linear feet of 15-inch private storm mains. The proposed site, sidewalk and parking lot work generally includes the installation of approximately 1,200 linear feet of utility sleeves, 84,611 square feet of parking lot pavement, 4,424 linear feet of curb and gutter installation, 18,411 square feet of concrete sidewalk, 233 linear feet of landscape block retaining wall, installation of 25 light poles, and the removal and replacement of approximately 1,600 linear feet of fence.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents