Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Fortuna/Avalon Interceptor Rehabilitation
Infrastructure
Bidding
Albuquerque, NM 87151

2021 Manhole and Water Valve Adjustment
Infrastructure
Bidding
Farmington, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Wastewater Collection System Expansion
Results
Edgewood, NM

Dry Barrel Fire Hydrants
Infrastructure
Bidding
Alamogordo, NM

Construction of the Wastewater Collection Lines
Post-Bid
Cimarron, NM 87714

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Wastewater System Improvements Phase 4B-2
Infrastructure
Bidding
Ranchos de Taos, NM

Black Mesa 3 Dam Outlet Raymac Dam to Mccoy Dam Phase V Project
Post-Bid
$3,464,000 est. value
Albuquerque, NM 87107

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Pyramid Street Water System Improvements
Infrastructure
Bidding
Lordsburg, NM 88045

Alcalde MDWCA Water System Improvements
Post-Bid
$371,873 est. value
Alcalde, NM 87511

Last Updated 09/16/2021 01:34 PM
Project Title

Santa Clara Pueblo Water and Wastewater System Improvements - Upper West Housing

Physical Address View project details and contacts
City, State (County) Santa Clara, NM   (Grant County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,034,484
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of work within Below Obsidian Road and Winter Road in the West Housing Area of Santa Clara Pueblo. Work includes the installation of approximately 4,967 linear feet (LF) of new 8-inch, 6-inch, and 4-inch water distribution waterline via horizontal directional drilling, and approximately 288 LF of open trench. Distribution waterline installation will include new service connections, fire hydrants and gate valves; and connections to the existing water system and residential services. Sewer installation includes approximately 3,561 LF of new 8-inch gravity sewer via horizontal directional drilling; 45 LF of new 8-inch sewer via jack and bore; approximately 2,007 LF of sewer service line; new manholes; the abandonment of manholes; and site restoration. A bid alternative is included to substitute the installation method from horizontal directional drilling to open trench. The bid alternative also includes additional asphalt paving due to the open trench.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents