Similar Projects
Frames and Grates
Term Contract
Bidding
Kenner, LA

EBR Essen/Starting LRG Diameter Sewer Rehab
Infrastructure
Bidding
Baton Rouge, LA

WW Collection System Rehabilitation Cured in Place Pipe
Infrastructure
Post-Bid
Lafayette, LA

2021 Water and Sewer Maintenance
Term Contract
Post-Bid
est. value
Mandeville, LA

Annual Parishwide Sanitary Sewer and Storm Water Pump Station Wet Well Cleaning Project
Term Contract
Results
$1,000,000 est. value
Baton Rouge, LA

Rehabilitate Grit Basins 1 and 2 Controls
Infrastructure
Results
New Orleans, LA

Melrose and Upstream Lift Station Upgrades (D2-3) Sewer Capital Improvement Program
Renovation, Infrastructure
Bidding
$340,000 est. value
Melrose, LA

Cast Iron Manholes
Infrastructure
Post-Bid
Hahnville, LA

Wallace Interceptor at Boggy Bayou STO 2
Infrastructure
Results
$1,961,170 est. value
Shreveport, LA

Grease Trap Cleaning and Water Jetting Service
Term Contract
Bidding
Baton Rouge, LA

Cast Iron Curb Inlets
Infrastructure
Post-Bid
Hahnville, LA

ADS Sanitite HP Pipe
Infrastructure
Results
Lafayette, LA

2022 Frames and Grates
Infrastructure
Bidding
Lafayette, LA

Cast Iron Grates and Frames
Infrastructure
Post-Bid
Hahnville, LA

Consolidated Sewer District Project XIV
Infrastructure
Results
Lafayette, LA

Last Updated 05/12/2022 11:58 PM
Project Title

Mid-City Basin No. 3 Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70181   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the rehabilitation of existing main line sanitary sewers via mainline cleaning and CCTV inspections, excavated point repairs, full length main line replacements, house connection service lateral replacements, full-length Cured-in-Place Pipe (CIPP) lining, service lateral Cured-in-Place Pipe (CIPP) lining and manhole rehabilitation. Work also includes associated interim and final pavement restoration. The project is generally located in the Bayou St John, City Park, Fairgrounds, Marigny, Mid-City, Treme-Lafitte, TulaneGravier, 7th Ward Neighborhoods within Orleans Parish. The project work area is generally bounded by the Interstate 10 to the West, City Park Ave, DeSaix Blvd & Florida Ave to the North, Elysian Fields Ave to the East and Interstate 10 and to the South

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents