Similar Projects
Installation of HVAC Systems
Bidding
Hustonville, KY 40437

Mechanical HVAC – Boiler Replacement
Bidding
Stanford, KY 40484

HVAC Filters
Post-Bid
KY

PHS HVAC Replacement Units
Post-Bid
Falmouth, KY 41040

HVAC Preventative Maintenance
Results
Fort Wright, KY

Reiley Elementary School Gymnasium AC
Results
KY

Carrier I-VU HVAC Control System
Post-Bid
Fort Wright, KY

Boone County Schools Geothermal Upgrades
Results
KY

Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Cooling Tower Replacement
Results
Burlington, KY 41005

Vehicle Exhaust Removal System
Post-Bid
Elsmere, KY 41018

HVAC Preventative Maintenance, NWS Paducah, KY
Results
Paducah, KY

HVAC and Mechanical Products
Term Contract
Post-Bid

Walton Verona High School Rooftop Equipment
Results
Walton, KY 41094

Chiller and Water Replacement at Rutherford Elementary School
Post-Bid
Louisville, KY 40214

Last Updated 03/04/2021 09:12 AM
Project Title

Ahrens Educational Resource Center/J. Graham Brown School HVAC Phase I

Physical Address View project details and contacts
City, State (County) Louisville, KY 40202   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of construction of a renovation to an existing school. The work consists of concrete work, structural steel, masonry, demolition, mechanical, electrical, and plumbing work, and partition, flooring, ceiling, and painting work. The school consists of approximately 241,000 sqft. Windows are aluminum storefront wall units. Floor finishes include vct, carpet, and ceramic tile. Interior walls are cmu and/or metal studs with g.w.b. Wall finishes are paint and some wood paneling in the Auditorium. Ceilings are suspended acoustical tile and gypsum wallboard. MEP work is the majority of the project and includes full replacement of HVAC, electrical and lighting, and sprinkler/plumbing renovations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents