Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$10,000 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

300 Tons Superpave Wearing Course
Infrastructure
Post-Bid
Grove City, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

McAlister's Deli / Hermitage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hermitage, PA 16148

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Sharon Gateway Project
Infrastructure
Results
$500,000 to $999,999 est. value
PA

Last Updated 07/05/2023 01:12 PM
Project Title

Stoneboro Community Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Stoneboro, PA 16153   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $499,950 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 5, 2023, project was awarded to Maker Construction Corp, awarded amount is $499,950.00.** Scope- Sidewalk replacement, ADA ramp construction, drainage replacement and associated pavement improvements for municipal roadways at various locations within the Borough of Stoneboro. Work will also include restoring all disturbed areas to original condition. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. The estimated cost for this project is greater than Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. Funding for this project is in part provided by a Multimodal Transportation Fund Grant Contract No. C000076365 and No. C000081938. The Borough of Stoneboro reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Borough of Stoneboro, and to reject any or all proposals. CLARIFICATION DEADLINE 5/1/2023 4:00 PM The Work will be substantially complete on or before September 1, 2023, Final completion- on or before October 1, 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents