Similar Projects
Jefferson Regional Medical Center Replacement Hospital
New Construction, Renovation, Infrastructure - 235,950 SF
Design
$40,000,000 CJ est. value
Pine Bluff, AR 71603

Fiber Optic Cabling Installation
Infrastructure
Design
$200,000 CJ est. value
White Hall, AR 71602

University of Arkansas at Pine Bluff (UAPB) Track and Soccer Stadium
Infrastructure
Post-Bid
$8,000,000 CJ est. value
Pine Bluff, AR 71601

Pump Station #14 Bar Screen - Rebid
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Pine Bluff, AR 71603

District 2 R.E. Office 23 (Pine Bluff) (S)
Infrastructure
Results
AR

Southeast Arkansas and Northeast Louisiana Multimodal Freight Corridor Improvement Project - Railroad Timber Bridge Construction
New Construction, Infrastructure
Results
$473,213 CJ est. value
Pine Bluff, AR 71601

Pine Bluff Pediatric Clinic
Addition, New Construction, Infrastructure - 9,700 SF
Pending Verification
$17,500,000 CJ est. value
Pine Bluff, AR 71601

RFQ Construction Manager - Sixth and Main Retail and Food Court District
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$625,000 CJ est. value
Pine Bluff, AR 71601

Pine Bluff Regional Airport (PBF) South Access Road Rehabilitation
Infrastructure
Results
$191,950 CJ est. value
Pine Bluff, AR 71601

Build Single Family Homes
New Construction, Infrastructure
Post-Bid
$750,000 CJ est. value
Pine Bluff, AR 71601

U.S. Highway 65 Expressway Pedestrian Bridge
Infrastructure
Post-Bid
$300,000 CJ est. value
Pine Bluff, AR 71601

Saracen Hotel / Event Center - WP#3
Addition, Demolition, Infrastructure - 400,000 SF
Post-Bid
$121,000,000 CJ est. value
Pine Bluff, AR 71601

Altheimer and White Hall Overlay (S)
Infrastructure
Post-Bid
$1,175,894 CJ est. value
Altheimer, AR 72004

Provide and Install a 100 F.T. Self-Supporting Tower
Infrastructure
Post-Bid
$500,000 CJ est. value
Pine Bluff, AR 71601

Chick-fil-A / Pine Bluff
New Construction, Infrastructure - 4,953 SF
Post-Bid
$5,000,000 CJ est. value
Pine Bluff, AR 71601

Last Updated 09/20/2023 04:13 PM
Project Title

Tucker Lake Levee & Drainage District Twin Rivers Pump Station - Contract II

Physical Address View project details and contacts
City, State (County) Pine Bluff, AR 71601   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Lift and Pump Stations, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $28,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct (2) coffer dams, pump and drain existing water and inspect/evaluate the existing sluice.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents