Similar Projects
Victory in Christ Christian Center Addition
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Westville, NJ 08093

RFP Construction Manager at Risk - Construction Manager at Risk for School of Veterinary Medicine and Translational Research Tower
New Construction, Infrastructure
Bidding
$4,100,000 CJ est. value
Glassboro, NJ 08028

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Veterinarian School Building - Rowan University
New Construction, Infrastructure
Post-Bid
$135,000,000 CJ est. value
Glassboro, NJ 08028

2021 Road Program - Johnson Road
Infrastructure
Results
NJ

Charles III Drive Roadway Improvements
Infrastructure
Results
Glassboro, NJ 08028

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Memorial Hall Inner Campus Underground Piping
Infrastructure
Post-Bid
$40,000 est. value
Glassboro, NJ 08028

Water Main Replacement at East Woodbury
Infrastructure
Results
Deptford, NJ

Homestead at Harmony Renovation
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Gibbstown, NJ 08027

Owl Statue Inner Campus Underground Piping
Infrastructure
Post-Bid
$40,000 est. value
Glassboro, NJ 08028

Paulsboro Marine Terminal Operational Roadways and Support Areas
Infrastructure
Results
Paulsboro, NJ 08066

Bella Vista Village
New Construction, Infrastructure - 7,360 SF
Pending Verification
$30,000,000 CJ est. value
Washington Township, NJ 08080

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Last Updated 09/08/2023 08:39 AM
Project Title

Public Works Garage Site Work and Building Pad

Physical Address View project details and contacts
City, State (County) National Park, NJ 08063   (Gloucester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $307,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Public Works Garage Site Work and Building Pad Significant Items Include Approximate Quantities: 6" Sanitary Sewer Lateral 23 Cy Concrete Foundation 338 Sy Building Slab 8" Thick 78 Sy Concrete Apron, 8" Thick 135 Sy Concrete Apron, 6" Thick Restoration of Stone Parking Area. Each proposal bid must be accompanied by a bid bond or certified check for not less than ten percent (10%) of the amount of the bid, of which, the amount of the bond or certified check need not exceed $20,000, made payable to the Township of West Deptford. Consent of Surety and Power of Attorney is required for the Performance Bond. The successful bidder will be required to furnish, within ten (10) days after the award, a Surety Corporation Performance Bond or Letter of Credit equal to one hundred percent (100%) of the contract price. All applicable surety bonds or LOC required must be written by a surety company listed on the Federal Treasury List (Department Circular 570-Surety Companies Acceptable on Federal Bonds) and such surety company must be acceptable to the Township Administrator and authorized to do business in the State of New Jersey. The Township of West Deptford reserves the right to reject any and all bids, either in whole or in part and also to waive any informality in any bid or bids so received The Sanitary Sewer Lateral item is changed to: Provide (1) 4" brass floor drain, a 4" trap and extend pvc sanitary drain pipe to 5 feet beyond the building foundation. The remainder of the sanitary lateral line, exterior cleanouts, and connection to the sewer main in the street will be done by others. Work of this Public Works Garage Project is intended to provide the Owner with a completed concrete building pad foundation, with reinforced concrete aprons and a sanitary sewer lateral which are ready for a building contractor to use for erection of a pre-manufactured steel garage. No building assembly or construction is included in this Sitework contract This Sitework contract does include furnishing and setting the anchor bolts for the future steel building into the formed concrete slab pad. This contract includes earth subgrade preparation and construction of concrete footings. Installation of under slab insulation is included. Connections of the foundation through the insulation into the slab is required. Grading and restoration of the adjacent stone parking area is required. No turf repair or landscaping is required. .Soil Erosion controls are required, to the extent that the Conservation District deems necessary. The new building will be located on the Public Works facility, 22 Grove Avenue, West Deptford, NJ adjacent to the existing building. No connection to the existing building is required. A reinforced concrete apron will extend from the existing asphalt apron at the covered patio, to and around the new building.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents