Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Replacing Existing Air Handlers - Fort McCoy, WI
Renovation
Design
$1,000,000 CJ est. value
Fort McCoy, WI 54656

Boiler Controls Update at the Public Safety Building
Renovation
Bidding
$400,000 CJ est. value
Kenosha, WI 53140

Roof Top Ventilation Units Replacement Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Reedsburg, WI 53959

Vendor Service Contract for HVAC Maintenance and Repair Services
Term Contract
Sub-Bidding
Milwaukee, WI 53202

Saint Croix County Highway Buildings HVAC Update
Alteration
Post-Bid
Deer Park, Hudson, Somerset, WI 54016

HVAC Upgrades
Alteration
Post-Bid
Hayward, WI 54843

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

AHU 11 and 12 Steam Coil Replacement
Alteration
Results
$221,200 est. value
Green Bay, WI 54311

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Replace Boiler Building 121 and 122
Renovation
Construction
$159,230 CJ est. value
Camp Douglas, WI 54618

HVAC Preventive Maintenance and Emergency Diagnostic/Repair Services for Kenosha Public Library
Term Contract
Sub-Bidding
Kenosha, WI 53140

Science Building HVAC Repairs
Alteration
Post-Bid
Kenosha, WI 53144

Air Conditioning Addition and Needlepoint Bipolar Ionization
Alteration
Results
Pittsville, WI

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

Last Updated 08/12/2023 08:38 AM
Project Title

MEP Cooler Replacement

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $21,023 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. two freezer sections and three cooler sections. Existing condensing units in an adjacent room will be removed and replaced. Disconnect the existing electrical connections and reconnect new system. Patch adjacent walls and repaint. Rework ceiling/soffit and grid system around new units. This project will repair/replace floor surfaces and fillers adjacent to the coolers and freezers, and apply a new coat of epoxy floor finish adjacent to the new units as well as surrounding kitchen areas. Base Bids will be received as a single lump sum bid for: 5) Electrical.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents