Similar Projects
Primrose at Pleasant Prairie
New Construction
Design
Pleasant Prairie, WI 53158

UW Transplant Clinic
Build-Out
Design
$20,000,000 est. value
Madison, WI 53792

Kitchen Remodel - Brewster Village
Renovation
Bidding
Appleton, WI 54914

Shine Office And Therapeutic Building Renovation
Renovation - 56,032 SF
Post-Bid
Janesville, WI 53546

Port Washington Assisted Living
New Construction - 27,967 SF
Post-Bid
Port Washington, WI

Cottage Demolition and Restoration
Renovation
Results
Less than $700,000 est. value
King, WI

Brewster Village Kitchen Remodel
Renovation
Results
Appleton, WI 54914

The Big Barn Dog Rescue Shelter
Renovation - 4,800 SF
Construction
$1,000,000 est. value
Salem, WI 53168

Oakridge Gardens
New Construction
Construction
Menasha, WI 54952

Encompass Rehabilitation Hospital
Renovation, Addition
Pending Verification
Eau Claire, WI 54701

Encompass Health Rehabilitation Hospital
New Construction
Pending Verification
Fitchburg, WI

Rolling Hills Rehab & Care Center
New Construction
Post-Bid
Sparta, WI 54656

Rolling Hills Nursing Home Project - Bid Package 2
New Construction - 80,000 SF
Results
Sparta, WI 54656

Rolling Hills Nursing Home - Bid Package 1
New Construction
Post-Bid
Sparta, WI 54656

Boland Hall Nurses Station Remodeling - MEP
Renovation
Results
$525,000 est. value
Union Grove, WI 53182

Last Updated 09/20/2021 08:17 AM
Project Title

Boland Hall Nurses Station Remodeling-GPC

Physical Address View project details and contacts
City, State (County) Union Grove, WI 53182   (Racine County)
Category(s) Medical
Sub-Category(s) Nursing/Rehabilitation Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work includes re-modeling the existing six Nurse Stations to create enclosed work space, new reception counter for computer stations and patient transactions, chart room cabinets and new counter tops. The electrical will be upgraded to accommodate the new configuration. Other work includes re-finishing of two elevator cabs and replacing the reception desk at the main entrance of the facility.

Details

Nursing/Rehabilitation Center, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents