Similar Projects
295 Chipeta Way - Ahu #3 Fan Wall Upgrade
Renovation
Sub-Bidding
$195,877 CJ est. value
Salt Lake City, UT 84108

DNR Admin Data Center Cooling
Renovation
Sub-Bidding
$195,000 CJ est. value
Salt Lake City, UT 84111

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

Electric Heat Pump Water Heater
Term Contract
Post-Bid
Salt Lake City, UT

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

Eccles HVAC Fans and Tab
Results
Less than $225,000 est. value
Sandy, UT

Calvin Smith Elementary HVAC controls upgrade
Renovation
Sub-Bidding
$300,000 CJ est. value
Taylorsville, UT 84129

Hydraulic Test Stand Chiller
Post-Bid
Salt Lake City, UT 84116

Annual Contract for Large A/C and Chiller Repairs
Term Contract
Results
Salt Lake City, UT

J041--660 - (S4) Emergent Air Handler Repair Bldg 2 Ahu Repairs
Post-Bid
Salt Lake City, UT 84148

DFCM Construction Pre-Qualified Mechanical-SLCC/SCC Heating Plant Boiler Replacement
Results
$487,000 est. value
Salt Lake City, UT

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

Chiller Replacement Jefferson Jr. High School
Results
Kearns, UT 84118

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Gourley Elementary School HVAC Upgrade
Results
Kearns, UT 84118

Last Updated 08/31/2022 12:36 PM
Project Title

Hunter Elementary School Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84120   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $313,570 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Granite School District will reject a bid if the bid is not responsive or the bid is submitted by a bidder who is not responsible. Granite School District trash cans and dumpsters may not be used by the contractor or by sub-contractors without specific permission by Granite School District. Question Submission Close Date The anticipated start date of construction is August 15, 2022. b. The date of Substantial Completion is November 15, 2022. 8/4/2022 2:00 PM MDT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents