Similar Projects
Last Updated | 12/15/2023 09:35 AM |
Project Title | RFQ Engineering - US-191, Cochise Railroad Overpass Design Bridge Replacement and Drainage Improvement |
Physical Address | View project details and contacts |
City, State (County) | Cochise, AZ 85606 (Cochise County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected January 2025 |
Bids Due | View project details and contacts |
Estimated Value | $41,250,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of December 15, 2023, information regarding award and award has not been disclosed. Although a firm timeline for construction has not been determined, project letting is estimated for Q4 of 2024. *The closed solicitation has been included below for reference: Arizona Time/Adot Is Accepting Statements of Qualifications (Soqs) From Consultants to Provide Design Serves to Replace Railroad Bridge and Drainage Improvements. ECS reserves the right to reject any and all SOQs, cancel the advertisement, negotiations or contract at any time in the best interest of the State. Any firm that has submitted an SOQ as a prime consultant and is identified as a subconsultant in another prime consultants proposal shall have their prime consultant SOQ submission rejected. If a Prime Consultant lists firms as Subconsultants in its SOQ, the Prime Consultant must be able to provide ADOT with evidence, if requested, of written consent provided by the Subconsultant firms that are listed as part of their Prime Consultants SOQ, or that Prime Consultants SOQ will be rejected. This contract has been established as Race Conscious with a 6.40% DBE Goal. The Compensation Type for this contract will be Lump Sum. The non-negotiable Fixed Fee for this contract, and any applicable extensions, has been established at 10%. Questions, in writing, shall be received by ECS until Tuesday, June 28, 2021 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. Final Questions Due: June 28, 2021 at 2:00 P.M. (Arizona Time). The method of contractor selection has not been determined at this time. AZDOT - RFQ Engineering - US-191, Cochise Railroad Overpass Design Bridge Replacement and Drainage Improvement |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |