Similar Projects
Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Royal Oak Apartments
New Construction, Demolition - 3,820 SF
Design
$500,000 to $1,000,000 CJ est. value
Royal Oak, MI 48067

Magna Headquarters - Office Space Remodels
Renovation - 5,000 SF
Post-Bid
Troy, MI 48098

Borden Park Office and Innovation Hills Park Ranger Station
Renovation
Post-Bid
Rochester Hills, MI 48307

Office Relocation and Site Work Fell Center
Results
Pontiac, MI 48342

DPW Office Improvement Project
Results
Berkley, MI 48072

Truck-Lite
New Construction - 40,000 SF
Construction
$4,000,000 est. value
Southfield, MI 48076

Charles Schwab
Renovation - 705 SF
Construction
Troy, MI 48084

Farmers and Merchants State Bank
Renovation
Pending Verification
Orchard Lake, MI 48323

West Huron Street Mini-Storage
New Construction, Renovation
Pending Verification
Pontiac, MI 48341

Southfield Industrial Park - Mixed-Use Building
New Construction - 125,876 SF
Design
$10,000,000 CJ est. value
Southfield, MI 48033

Somerset Park Apartments: Administration & Leasing Building
New Construction - 10,000 SF
Post-Bid
Troy, MI 48084

Pine Village - 55 and Older Development
New Construction, Demolition - 170,149 SF
Construction
$12,000,000 est. value
Madison Heights, MI 48071

Rochester Road Mixed-Use Building
New Construction, Demolition - 26,575 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Rochester Hills, MI 48307

Donor Advertising - New Headquarters
Renovation - 62,000 SF
Design
Southfield, MI 48034

Last Updated 04/13/2022 02:35 PM
Project Title

City Center Office Plaza

Physical Address View project details and contacts
City, State (County) Novi, MI 48375   (Oakland County)
Category(s) Commercial
Sub-Category(s) Bank, Office
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is 15,300 Sq Ft 3-story office building. First floor will be 4,423 Sq Ft bank with 2 drive-thru lanes.

Details

19,723 SF - Office, 3 Stories Above Grade, 15,300 SF New Construction, 65 Parking Spaces, 1.25 Acres, Bank, 4,423 SF New Construction, 2 Drive-thru.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Windows, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Specialty Casework, Bank Casework, Rugs and Mats, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents