Similar Projects
Buffumville Lake Electrical Upgrades, Charlton, MA
Design
$250,000 to $500,000 est. value
Charlton, MA

Electrical Upgrades, Birch Hill and Tully Lake Dams
Design
$250,000 to $500,000 est. value
Royalston, MA

Replace Emergency Lights
Alteration
Bidding
$41,767 est. value
Dudley, MA 01571

Energy Management Control System Replacement
Alteration
Bidding
$350,000 est. value
Upton, MA

Asbestos Abatement on the Second Floor of the West Boylston Fire Station- Sub-Bid
Post-Bid
$45,000 to $65,000 est. value
West Boylston, MA 01583

Middleton Various Locations Solar and Lighting Upgrades
Post-Bid
Middleton, Roslindale, Westborough, MA

Maintenance and Repairs of Energy Management Systems
Results
Less than $150,000 est. value
Worcester, MA 01605

Solar Photovoltaic System Purchase and Installation for the Town of Sutton Police Station
Results
Less than $80,000 est. value
Sutton, MA 01590

School Central UPS Project - Phase 2
Alteration
Bidding
$350,000 est. value
Worcester, MA 01655

Replace Grid Ceiling and Lighting In Four Hallways of Haley Academic Building
Post-Bid
Less than $135,000 est. value
Gardner, MA 01440

Install Solar Array FMS Worcester Skyline
Results
Less than $220,000 est. value
Worcester, MA

Pad Mount Transformers
Alteration
Bidding
Shrewsbury, MA

Renovation of Electrical
Post-Bid
West Boylston, MA

Christmas Lights and Decorations Rental and Installation FY2021 - 2023
Term Contract
Results
Leominster, MA

Electrical and Lighting Supplies
Post-Bid
Worcester, MA

Last Updated 02/08/2022 12:18 PM
Project Title

HVAC Equipment Upgrades Richard Sugden Library

Physical Address View project details and contacts
City, State (County) Spencer, MA 01562   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $391,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, the following: 1. Modular Indoor Air Handling Units. 2. Split System Ducted Air Handling Units. 3. Air Cooled Condensing Units. 4. Return Fans. 5. Hydronic Supply and Return Piping. 6. Hydronic Accessories. 7. Refrigeration Piping. 8. Refrigeration Accessories. 9. Condensate Drain Piping and Pumps. 10. Piping Insulation. 11. Equipment Insulation. 12. Sheet Metal Ductwork. 13. Ductwork Accessories. 14. Ductwork Insulation. 15. Automatic Temperature Controls. 16. Testing, Adjusting and Balancing (Coordination and Access). 17. O&M Manuals. 18. Operating Instructions. 19. Record Drawings. 20. Staging, Ladders, Scaffolding, Hoists and All Related Equipment. 21. Firestopping at all penetrations.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents