Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Rebuild and Resurfacing - Various Streets
Infrastructure
Post-Bid
$2,000,000 est. value
Troy, AL

John Anderson Road Resurfacing and Re-Striping
Infrastructure
Post-Bid
$350,000 CJ est. value
Goshen, AL 36035

Road Improvements
Infrastructure
Results
$459,323 est. value
Troy, AL 36079

Constructing The Intersection Improvements, Access Management, and Additional Left Turn Lane (Grading, Drainage, Pavement, and Traffic Signals) on SR-10 (Us-231) at Henderson Highway (3 Notch Street)
Infrastructure
Results
$807,358 to $986,770 est. value
Troy, AL

701-711 S Brundidge Street Residential
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36081

Walters Street Assisted Living Facility
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36079

Constructing the Planing, Resurfacing, and Traffic Stripe on Sr-93 from the Junction of Sr- 53 (Us-231) to the Junction of Lakeview Drive in Brundidge
Infrastructure
Results
$1,083,561 to $1,324,352 est. value
Brundidge, AL

701-711 S Brundidge Street Residential
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36081

Roadway Resurfacing and Traffic Striping
Infrastructure
Results
AL

The Trace on Orion
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Troy, AL 36081

Concrete Sidewalks along Park Street, Corman Avenue, and Second Avenue
Infrastructure
Results
$735,015 CJ est. value
Troy, AL 36081

Ramage Park Trail Improvements - City of Brundidge
Infrastructure
Pending Verification
$200,000 CJ est. value
Brundidge, AL 36010

Planing, Resurfacing, and Traffic Stripe on SR-87
Infrastructure
Results
$1,268,392 CJ est. value
Troy, AL 36079

Last Updated 12/20/2022 04:41 AM
Project Title

Roundabout Installation (Grading, Drainage, Pavement, Lighting, and Traffic Stripe) on SR-167 at SR-87

Physical Address View project details and contacts
City, State (County) Troy, AL 36079   (Pike County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,435,415 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Pike Constructing the Intersection Improvements, Acceleration Lane Extension, Traffic Signals, and Traffic Stripe on SR-1 (US-431) at SR-79 northeast of Guntersville. Length 0.313 mi. The Bracket Estimate on this project is from $2,847,774 to $3,480,613 . Contract Time: 95 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 019 - Roundabout Installation (Grading, Drainage, Pavement, Lighting, and Traffic Stripe) on SR-167 at SR-87 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents