Similar Projects
Berlin Mall New Mixed-Income Housing Development
New Construction, Infrastructure
Design
$5,750,000 est. value
Berlin, VT 05602

RFP Design - Washington Superior Court Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$900,000 CJ est. value
Barre, VT 05641

Umbrella Contract for Statewide Site and Earthwork Services
Term Contract
Post-Bid
Montpelier, VT

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Main Street Pedestrian Bridge
Results
$649,790 est. value
Plainfield, VT 05667

Berlin CMG Park (45)
Results
$1,000,000 to $2,500,000 est. value
Berlin, VT

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Camp Smith Universally Accessible Trail Phase 2
Infrastructure
Post-Bid
Waterbury, VT

Site Work Services
Term Contract
Results
$60,000 est. value
Montpelier, VT

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Williamstown-Northfield CMG Park (49)
Results
$1,000,000 to $2,500,000 est. value
Northfield, Williamstown, VT

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

The Bridges Resort - Water Treatment System Improvements
New Construction, Infrastructure
Post-Bid
$425,000 CJ est. value
Warren, VT 05674

Last Updated 08/04/2022 06:05 PM
Project Title

BGS - ANR - FPR Monroe Trailhead Parking Expansion

Physical Address View project details and contacts
City, State (County) Duxbury, VT 05676   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $140,540 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors are invited to bid on the Monroe Trailhead Parking Expansion Project for the Agency of Natural Resources, Department of Forest, Parks, and Recreation at 3508 Camels Hump Road in Duxbury, Vermont. This project consists of, but is not limited to: An expansion of an existing gravel parking lot at Monroe Trailhead in Duxbury, VT. This expansion will include tree clearing, grubbing, grading, cut/fill, hauling, ditching, culvert installation, placing and compacting base and surface course materials, sediment and erosion control measures and turf establishment.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Culverts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents