Similar Projects
Cameras and Equipment
Term Contract
Design
Tahlequah, OK 74464

Materials - Remove/Properly Dispose of Asbestos Containing Materials and Lead Based Paint
Term Contract
Design
El Reno, OK 73036

Emergency Electric Power Restoration and Debris Removal Services
Term Contract
Bidding
Anadarko, OK 73005

Lawton Indian Hospital Emergency Department, Imaging Services and Laboratory Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Lawton, OK 73507

Oklahoma Forensics Center - Bid Package #2
Addition, Build-out, Renovation, Infrastructure - 34,989 SF
Sub-Bidding
$6,000,000 CJ est. value
Vinita, OK 74301

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Moore Public Works
New Construction
Construction
Moore, OK 73160

Re-Bid 22A, 23A Custer County Restroom Renovation
Renovation
Construction
$300,000 CJ est. value
Arapaho, OK 73620

Frost Chiropractic at Park Plaza
Build-out - 2,428 SF
Pending Verification
$435,049 CJ est. value
Tulsa, OK 74131

Affordable Quality Care Office Remodel
Build-out - 3,074 SF
Pending Verification
$165,000 CJ est. value
Norman, OK 73071

Better Vision Ahead 2nd Floor Remodel
Build-out - 4,218 SF
Design
$150,000 CJ est. value
Norman, OK 73072

New 1800 Square Foot Community Center for the Cottonwood Community
Infrastructure
Bidding
$250,000 CJ est. value
Coalgate, OK 74538

Last Updated 05/30/2023 11:34 AM
Project Title

RFP D/B - Pawnee Nation Design Build Projects FY23 Construction Manager / General Contractor

Physical Address View project details and contacts
City, State (County) Pawnee, OK 74058   (Pawnee County)
Category(s) Government/Public, Medical
Sub-Category(s) Capitol/Court House/City Hall, Medical Office/Outpatient, Misc. Buildings
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Results, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,246,643 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Request for Proposal (RFP) is meant to provide prospective Offerors with sufficient information to enable them to prepare and submit proposals for consideration by Pawnee Nation of Oklahoma, a sovereign nation; hereby known as the "Owner" for Pawnee Nation Design Build Projects FY23. The intent of this RFP is to rapidly and cost effectively deliver a project using one Design-Build (DB). This will allow the Project Team to strategically and innovatively plan, fund, permit, design, and build in a manner which constructs the greatest amount and length of projects within the current available funding. The Project Team's initial focus should be to identify and begin construction on the projects or portions of project that are potentially and/or can quickly be made "shovel ready" while simultaneously working on other project areas within the program that are awaiting final design concepts. The Owner's Intent is that the DB will begin construction within one month after the Notice to Proceed. The Owner is requesting the Offeror to propose on the DB of the Pawnee Nation Youth Learning Center. Owner seeks the best innovative solutions to accelerate construction and deliver a product under budget while accomplishing the following: enhancing value and quality; adding the most enhancements possible within the available funding i.e., stretching the dollars to construct the greatest amount and length of projects within the current available funding. The targeted goal is to complete the suite of projects under budget with on-time delivery through innovations proposed by the DB team. The Pawnee Nation has adopted a Tribal Employment Rights Ordinance (TERO). The Contractor, its appointed agents and all other parties will agree to recognize the rights, responsibility, authority, and determinations of TERO. The Contractor and all other parties will recognize that TERO has a primary commitment to the employment of Pawnee Nation members and the hiring of Indian preference employees. WRITTEN INQUIRES All inquiries regarding this RFQ shall be submitted in writing to the Owner prior to 1 p.m. CST May 15, 2023. A response from the Owner to all inquiries shall be sent via email on or before 5:00 p.m. CST, May 16, 2023. All responses to this RFP must be received, with time and date recorded by authorized Owner's staff by the above date and time. Sole responsibility rests with the Offerors to see that their RFP response is received on time at the stated location. A proposal may be withdrawn prior to the due date and time by written request. Any proposal not withdrawn by the due date shall constitute an irrevocable offer. The Offeror is responsible for all costs incurred by firms prior to issuance of a fully executed contract. All material submitted regarding this RFP will become the property of the Owner and will only be returned to the Offeror at the Owner's option. o Proposals Reviewed by Selection Committee - May 23-26, 2023 o Approximate Face to Face Interview Date - May 30- June 1, 2023 o Approximate Selection Date - June 9, 2023 o Approximate Contract for Services - June 16, 2023 o Approximate Notice to Proceed - June 16, 2023 o Approximate Kickoff Meeting - June 21, 2023 Acceptance of Proposal Content The contents of the proposal of the successful Offeror, and the RFP may become all or part of the Scope of Work and as such contractual obligations. Failure of the successful Offeror to accept these obligations in a contract may result in cancellation of the award. Design Build (DB) bundle delivery method is an integrated team approach to the planning, design, and construction projects. This delivery method allows the Design Build team to apply their professional management capabilities during the planning and design of a project Then provides traditional construction services functioning as the prime General Contractor (GC) responsible for completing the work on schedule within a guaranteed maximum price. The Project Team's initial focus should be to identify and begin construction on the project or portions of the project that are potentially "shovel ready" and/or can quickly be made "shovel ready" while simultaneously working on other areas within the program that are awaiting such things as: NEPA clearance, permitting, right-of-way, funding, third party approvals The Owner's Intent is that the DB will begin construction within one month after the Notice to Proceed 1. Pawnee IHS Garage Drive-Through The Pawnee Indian Health Center plans to construct an approximate 2500 SF standalone drivethrough testing garage with office space adjacent to the existing Pawnee Indian Health Center to provide a more modern, safe, and adequate facility from which to provide health care services. The new testing garage will provide a drive-through testing/vaccination clinic. The office spaces will be provided for the OEH&E department. The drive-through garage site will also provide 25 additional parking spaces. The relocation of this department provides additional clinic space within the clinic, which will improve the overall operations of health care delivery. Additional information can be found in the attached Project Summary Documents (PSD). This project is funded through Indian Health Services (IHS). The current funds available for this project are $1,671,643.00 million, to cover all aspects of construction, including professional fees. 2. Courthouse Renovations Project The Pawnee Nation is looking to renovate the current Pawnee Nation Courthouse (approximately 1,200 square feet) into a two functional area that will serve as offices for the Pawnee Nation Enrollment Office and other general office/meeting spaces.. Upgrades to this area will include (but not limited to); MEP upgrades, new flooring throughout, lowering of ceiling, new air units with duct work, creation of new office spaces, secure filing rooms, bathroom upgrades, weatherization of windows, light fixtures, etc. As part of this renovation job scope, it will also include upgrades to the current Pawnee Nation Resource Complex, as this facility was just recently completed in 2015; this area is looking to add a wall and possible upgrades to a singular doorway area and a courtroom judge's podium. This project is funded through BIA ARPA Funding. The current funds available for this project are approximately $500,000, to cover all aspects of construction, including professional fees. 3. BIA Roof Rehabilitation Project The Pawnee Nation is looking to rehabilitate the Bureau of Indian Affairs (BIA) roof. The project will consist of installing a new metal roof (26 ga.) 2-12 pitch over the existing flat roof. And Relocate downspout on NE side. The BIA roof is approximately 170x 38. This project is funded through Tribal Funds. The current funds available for this project are approximately $75,000, to cover all aspects of construction, including professional fees. The Design Build Team will be responsible to develop and maintain an overall project cost and resource loaded linear schedule for the permitting, right-of-way, utilities, design, construction, and close out for the suite of projects using a "cost and resource loaded" linear schedule for both the preconstruction and construction phases of the Suite of Projects. Owner currently anticipates Notice to Proceed (NTP) for the contract June 16, 2023. Project closeout is anticipated by January 1, 2024. During the preconstruction phase, the schedule will include all detailed coordination efforts to optimize the design including all Designer activities, permitting / environmental activities, utilities, all third-party/stakeholder activities, right-of-way activities, construction, and all the Owner activities. The obligation of the Owner and Federal Agencies to complete specific submittal reviews will also be included in the project schedule. Award of RFP/Right to Reject The contract will be awarded to the successful Offeror whose proposal, conforms to the RFP, and is most advantageous to the Owner. The Owner reserves the right to reject all proposals and to waive informalities and irregularities in the proposals received and to accept any portion of any proposal or all items proposed if deemed in the best interest of the Owner.

Details

,, 3,700 SF - 2,500 SF. 1,200 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Flagpoles.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Office Furniture, Seating, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents