Similar Projects
SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

Traffic Signal and Roadway Improvements
Infrastructure
Bidding
$70,000 CJ est. value
Hinesville, GA 31313

Traffic Signal and Roadway Improvements
Infrastructure
Bidding
$70,000 CJ est. value
Hinesville, GA 31313

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 LMIG Resurfacing
Infrastructure
Results
Hinesville, GA

Water System Improvements
Infrastructure
Results
$818,263 CJ est. value
Walthourville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hyundai Mobis PE Systems / Richmond Hill
New Construction, Infrastructure - 500,000 SF
Pending Verification
$54,000,000 CJ est. value
Midway, GA 31320

Mavis Tire #2134 / Hinesville
New Construction, Infrastructure - 6,137 SF
Bidding
$2,380,000 CJ est. value
Hinesville, GA 31313

South Main Street Widening Rebid
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Hinesville, GA 31313

Water System Improvements
Infrastructure
Results
$1,478,531 CJ est. value
Walthourville, GA 31313

Tradeport East - Southeast Parcel Drainage Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Hinesville, GA 31310

Last Updated 10/13/2023 09:02 AM
Project Title

Utility Relocation and Drainge Improvements South Main St. And Macarthur Dr. Widening

Physical Address View project details and contacts
City, State (County) Hinesville, GA 31313   (Liberty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer - 11/20/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing all labor and materials to complete the utility relocation and drainage improvements South Main Street Widening and the MacArthur Drive Improvement Projects. More specifically, the project consists of approximately 10,000 LF of water, sewer and reuse water main relocation ranging from 6" to 10" mains plus 10,000 LF storm sewer installation ranging in size from 15" to 36" pipe in preparation of the roadway widening and improvement projects. The project is divided into sections to accommodate all interested contractors. Bids will be accepted for the entire project or phases of the project. Each Contractor must prequalify for bid by submitting a completed "Statement of Bidder Qualifications" form supplied by the Engineer. Bids will be accepted from prequalified bidders only. Bids must be accompanied by a certified check or bid bond in an amount equal to at least five percent (5%) of total amount bid for the completed work. No bids may be withdrawn for a period of sixty (60) days after the closing time schedule for receipt of bids. The Owner reserves the right to accept or reject any or all bids and to waive informalities. Award of the contract, if it is awarded, will be to the lowest responsible bidder. The M/WBE goal for this project is 10% MBE and 3% WBE, for a total M/WBE participation of 13%. MWBE goals apply to the amount of the each bid. All M/WBE documents must be submitted in a separate sealed envelope, otherwise bid may be rejected. Requests for interpretations of Drawings and Specifications must be made in writing to the Engineer no later than seven (7) days prior to date set for receipt of bids, Question Deadline 11/22/2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents