Similar Projects
Airfield Rubber Removal and Striping
Alteration
Design
$25,000 to $100,000 est. value
Grissom ARB, IN

Extend Runway 9-27 - Paving and Lighting
Infrastructure
Bidding
Auburn, IN 46706

SBN - Reconstruct Taxiway B and Terminal Apron - Bid C
Infrastructure
Bidding
$200,000 est. value
South Bend, IN

Runway Extension Phase 2 - Grading & Drainage
Post-Bid
Zionsville, IN 46077

Midfield Taxiways R, P, H and N Rehabilitation
Post-Bid
Indianapolis, IN 46241

2020-2 Street Paving
Results
Less than $200,000 est. value
Chalmers, IN

T-Hangar Taxiway
Results
Marion, IN 46953

Runway 5R-23L and Taxiway D Strengthening and Capacity Enhancement - Package 2
Infrastructure
Bidding
$2,000,000 est. value
Indianapolis, IN 46241

Rehabilitate Taxiway "A", Phases 2
Infrastructure
Post-Bid
Gary, IN 46406

2021 T-Hangar Taxilane and Southwest Arpon Rehabilitation
Results
Columbus, IN 47203

Runway 5R-23L and Taxiway D Phase 1
Infrastructure
Post-Bid
IN 46241

Install Airfield Underdrains
Results
Kokomo, IN 46901

Rubber Removal and Striping at Grissom Air Reserve Base
Term Contract
Post-Bid
Grissom ARB, IN

Extent Parallel Taxiway
Results
$890,000 est. value
Plymouth, IN 46563

Grissom Air Reserve Base Runways Project Industry Day
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Grissom ARB, IN

Last Updated 05/31/2022 09:07 AM
Project Title

Grissom Air Reserve Base Runways Project

Physical Address View project details and contacts
City, State (County) Grissom ARB, IN   (Miami County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a renovation of approximate total mill and overlay is 3,290,000 square feet and approximate total full depth replacement is 471,000 square feet of PCC. The proposed project includes: Repair throats at Taxiway C to full depth. Conduct a repair of the north and south Taxiway C throats by removing all layers of pavement at full depth to subgrade and replace with Portland cement concrete (PCC). Repair Taxiway G sections. Remove the asphalt over Portland cement concrete (APC) at full depth to subgrade and replace with Portland cement concrete. Repair full length of Runway 12,501ft using mill and overlay and full depth PCC methods as designed. Variable Mill of surface and overlay with asphalt concrete (AC). Repair 1,200LF to full depth with PCC. Repair shoulders for the entire length of the runway (12,501ft) by variable milling of surface and overlaying with asphalt concrete. Repair the asphalt concrete paved overruns at the 23 and 05 ends of the runway by milling the surface and overlaying with asphalt concrete. Repair by replacement of airfield lighting circuits the (1) complete approach system for runway 05 (2) the threshold light bar at the end of runway 23 (3) feeder cables from home runs at both 23 and 05 ends (4) Taxiway G edge lighting (5) airfield guidance sign system.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents