Similar Projects
Malph's Pizza Pub
Renovation
Design
Rockford, MI 49341

Speedway #7535 Rebuild / Grand Rapids
Addition, Demolition, New Construction, Infrastructure - 5,600 SF
Design
$1,300,000 CJ est. value
Grand Rapids, MI 49505

Chick-Fil-A #4599
New Construction - 4,988 SF
Post-Bid
Walker, MI 49534

Starbucks #66570
New Construction, Build-Out - 2,240 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Walker, MI 49534

High School Food Service Office Addition
Addition
Results
$6,500,000 est. value
Grandville, MI 49418

Amway Grand Plaza Hotel Tower
Renovation
Construction
$40,000,000 est. value
Grand Rapids, MI 49503

Ada House
New Construction - 37,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Ada, MI 49301

Pizza Hut
Renovation - 1,500 SF
Pending Verification
Wyoming, MI 49519

Dual-Tenant Commercial Building
New Construction - 1,304 SF
Pending Verification
Less than $500,000 CJ est. value
Walker, MI 49534

Byron Center Retail
New Construction - 13,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Byron Center, MI 49315

Barrio Restaurant
Renovation - 4,318 SF
Post-Bid
$650,000 est. value
Grand Rapids, MI 49503

Kusterer Brauhaus
Renovation - 3,460 SF
Construction
Grand Rapids, MI 49504

SIP Coffee Shop & Cocktail Lounge
Renovation
Pending Verification
Grand Rapids, MI 49507

Smoke Shack BBQ
Renovation - 888 SF
Design
Walker, MI 49534

Starbucks - Broadmoor & 68th Street
Build-Out - 2,200 SF
Post-Bid
Caledonia, MI 49316

Last Updated 09/09/2022 12:31 PM
Project Title

Supermercado Mexico

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49503   (Kent County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Office
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,613,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2022, plans have yet to be submitted to the Grand Rapids Planning department for approvals. City commission approved brownfield tax incentives. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin spring 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 31,325 SF - Office, Approximately 14,000 SF Renovation, Food/Beverage Service, Approximately 17,325 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents