Similar Projects
Hot Water Storage Tanks Replacement Project
Renovation
Bidding
$500,000 CJ est. value
Aspen, CO 81611

RFP D/B - Mount Zion Trailhead Improvement Design-Build Project
Infrastructure
Bidding
$195,000 CJ est. value
Golden, CO 80401

Prairie Hawk Early Grading South
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Denver, CO 80202

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

Police Department Remodel
Build-out
Bidding
$230,000 CJ est. value
Manitou Springs, CO 80829

Concrete Repairs and Replacement Services
Term Contract
Post-Bid
Westminster, CO

Precast Foundations
Alteration
Results
Fort Collins, CO

Construction of the Calhan Highway Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Calhan, CO 80808

Berthoud Brick Stair Repair
Alteration
Post-Bid
$200,000 est. value
Golden, CO 80401

2022 Concrete Replacement Project
Infrastructure
Results
Aspen, CO

Playground Replacements for Farr Park, Sanborn Park, and Josephine Jones Park
Infrastructure
Bidding
$140,000 CJ est. value
Greeley, CO 80631

Last Updated 07/11/2023 05:04 AM
Project Title

Construction of the Silverton Road Improvements Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80921   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000322150 Purchase Type Term: 08/01/2023 02:00 AM EDT - 12/31/2024 02:00 AM EST Option: one additional renewal year Question Acceptance Deadline 06/21/2023 01:00 PM MDT Questions are submitted online No Description The proposed Silverton Road Project consists of widening the shoulder on the west side of Silverton Road at the curve south of Summit Drive, laying back the slope on the east side of Silverton Rd at/near Summit Dr, establishing the ditch on the east side of Silverton Rd from about Summit to Old North Gate, lining the ditch with riprap and replacing the pipe under Silverton at Old North Gate and removing the sand material on Summit Dr and replacing it with base course. All work shall be performed within El Paso County right-of-way and easements ("EPC ROW") acquired for the Project. Staging and stockpiles shall be within EPC ROW unless written permission is obtained from property owner(s). Utility relocation will be required during construction of the Project. Close collaboration and/or coordination with affected utility providers and their contractors will be required. Utility providers within the project limits include but may not be limited to: Black Hills Energy (gas), Zayo (fiber optic), Lumen/CenturyLink (fiber optic & telephone), and Mountain View Electric Association (electric). The Contractor shall provide access and accommodate all traffic at all times. General Requirements - Insurance Required - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents