Similar Projects
ACAD 312255 Rehabilitate Schoodic Water and Wastewater Systems
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Winter Harbor, ME

2021 Various Water Main Replacements Project
Post-Bid
Bethel, ME

Waterline Improvements Project
Post-Bid
Bangor, ME 04401

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

Benton Avenue Water Main Replacement
Results
Less than $2,000,000 est. value
Winslow, ME 04901

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Manning Avenue Water and Road Rehabilitation
Results
Lewiston, ME

BIA Pressure Zone Infrastructure Expansion - Water Main Replacement
Infrastructure
Post-Bid
Bangor, ME

Black Point Road Water Main Replacement
Results
Less than $175,000 est. value
Scarborough, ME 04074

Bradbury-Mason Street Storm Separation Improvements and Water Main Replacement
Infrastructure
Post-Bid
$700,000 est. value
Biddeford, ME

Foundry Road Water Main Replacement
Results
Less than $900,000 est. value
Livermore Falls, ME 04254

Construction of the Kennebec River Utility Crossing
Infrastructure
Post-Bid
$500,000 est. value
Augusta, ME

2021 Water Main Replacement and Road Rehabilitation
Results
Lewiston, ME

Last Updated 05/27/2022 01:09 AM
Project Title

West Gardiner Waterline Replacement

Physical Address View project details and contacts
City, State (County) West Gardiner, ME   (Kennebec County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be accepted from Contractors who can demonstrate successful completion of a minimum of five (5) similar water main installation projects in the last five (5) years. All other bids may be rejected. This Project includes a wage determination developed by the State of Maine Department of Labor. The work consists of replacing a waterline at the West Gardiner Service Plaza in the Town of West Gardiner, Maine. The work includes waterline replacement, valve and fitting installations, installing corrosion protection for existing pipe and fixtures, testing and disinfection, existing waterline shutdown, capping, and abandoning, and all other work incidental thereto in accordance with the Plans and Specifications. Proposals must be accompanied by an original bid bond, certified or cashier's check payable to the Maine Turnpike Authority in an amount not less than Five (5%) Percent of the Total Amount in the Proposal, but not less than $500.00. The Bidder to whom a Contract is awarded will be required to furnish a Surety Corporation Bond, satisfactory to the Authority, on the standard Contract Bond form of the Authority, for a sum not less than the Total Amount of the Proposal. Proposals must be made upon the Proposal Forms furnished by the Authority separately with the Contract Documents, and must be enclosed in the sealed special addressed envelope provided therefore bearing the name and address of the Bidder, the name of the Contract, and the date and time of Proposal opening on the outside.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents