Similar Projects
Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Lowell - Hartford Const / PVRPLA
Infrastructure
Design
$11,000,000 CJ est. value
Clyman, WI 53039

RFP D/B - Design and Install Electrical Service and Pedestals at Derge Park Campground, Beaver Dam
Infrastructure
Bidding
$100,000 CJ est. value
Beaver Dam, WI 53916

Firing Range Warming Building Replacement
Demolition, New Construction, Infrastructure - 1,920 SF
Bidding
$226,700 CJ est. value
Fox Lake, WI 53933

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

2021 Road Seal Coating and Crack Filling
Infrastructure
Post-Bid
Beaver Dam, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Dodge County Justice Building Parking Lot Paving
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Bobolink Road
Infrastructure
Post-Bid
Lowell, WI

Road Project
Results
Mayville, WI

Snow Plowing/Winter Maintenance
Term Contract
Post-Bid
Kekoskee, WI

Roadwork
Results
Lebanon, WI

2022 Bridge Street Reconstruction
Infrastructure
Post-Bid
Mayville, WI

Last Updated 12/19/2022 07:34 AM
Project Title

City of Beaver Dam, Frances Lane, Gateway Drive to N. Crystal Lake Road

Physical Address View project details and contacts
City, State (County) Beaver Dam, WI 53916   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $498,728 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

City of Beaver Dam, Frances Lane, Gateway Drive to N. Crystal Lake Road; County; 5995-04-71, WISC 2023 071; Local Street; 0.413 Miles; Excavation, Base, HMA Pavement, and Pavement Marking. Contract Completion Time: 20 Working Days Estimated Range $250,000 - $499,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 021 - City of Beaver Dam, Frances Lane, Gateway Drive to N. Crystal Lake Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents