Similar Projects
Dickinson - Sims Street Improvements Phase 1
Infrastructure
Bidding
$210,000 est. value
Dickinson, ND 58601

Water, Sewer, Storm and Street Improvement - Lost River 7th Addition
Infrastructure
Bidding
Horace, ND

Paving, Sanitary Sewer, Storm Sewer, Water Main Improvements
Post-Bid
$3,000,000 to $3,500,000 est. value
Valley City, ND

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

Sanitary Sewer, Water Main, Storm Sewer, Paving and Incidentals
Results
Less than $1,971,919 est. value
Fargo, ND 58102

2022 System Wide Distribution Improvements
Infrastructure
Bidding
$200,000 est. value
Kindred, ND

Advanced Metering Infrastructure System
Infrastructure
Post-Bid
$870,000 to $970,000 est. value
Grafton, ND

Water Transmission Line Rehabilitation
Results
Lakota, ND 58344

West Elementary Redevelopment
Infrastructure
Bidding
$366,000 est. value
Grand Forks, ND 58203

2021 FM Diversion Pipeline Improvements Phase 1
Infrastructure
Post-Bid
Kindred, ND

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

Water Improvement District 2022
Infrastructure
Bidding
$1,348,000 est. value
Bottineau, ND

Notice and Comment Opportunity - McKenzie County Water Resource District, System IV Part IV Rural Water Distribution Forest Service Project
Term Contract
Post-Bid
ND

Water Main Replacement, Storm Sewer, Street Reconstruction and Incidentals
Results
$3,523,290 est. value
Fargo, ND 58102

Last Updated 04/18/2022 04:57 PM
Project Title

BFEP - Pipelines

Physical Address View project details and contacts
City, State (County) Turtle Lake, ND   (McLean County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprised of Contract No. 1, Alternate No. 1, and Alternate No. 2, generally consists of construction of water pipelines and furnishing and installing the following approximate quantities: Contract No. 1 – Pipeline Construction Base Bid: A Clarified Water (non-potable) pipeline extending from Washburn up to the Blue Flint Ethanol Plant (BFEP) site. Approximately 7,800 feet of 16” HDPE and 46,000 feet of 12” HDPE including two cased bores: one using 24” HDPE under Highway 200 and the other using 16” Steel under the CP railroad spur. Also includes all associated fittings and appurtenances, restoration, flushing and testing. Alternate No. 1 to Contract No. 1: A 4” HDPE potable water line connecting to the existing MSRWD water system and extending approximately 1 mile north and 0.5 miles east to the BFEP site. Including a single 1” meter pit, approximately 1,800 of 2” site piping, one steel cased bore under the CP railroad spur and all associated fittings and appurtenances, restoration, flushing, disinfection, and testing. Alternate No. 2 to Contract No. 1: An 8” HDPE effluent water line from the BFEP site south approximately 9 miles to the Missouri River. Including approximately two 48” concrete manholes, two ARV pits, one PRV concrete vault and all associated fittings and appurtenances, restoration, flushing and testing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents