Similar Projects
La Verkin Elementary School Fire Sprinklers
Post-Bid
La Verkin, UT 84745

Fire Alarm Replacement
Post-Bid
Nephi, UT 84648

DFCM Construction - State Hospital Rampton 2 and Forensics Fire Alarm Upgrades
Results
$300,000 est. value
Provo, UT 84606

Bountiful High School Fire Alarm Upgrade
Results
$250,000 to $450,000 est. value
Bountiful, UT 84010

Replace Fire Suppression System at Fish Springs National Wildlife Refuge, UT
Post-Bid
$25,000 to $100,000 est. value
Ibapah, UT

SLCC TRC TB Corridor Ceiling and Fire Sprinkler Upgrade
Results
$990,000 est. value
Salt Lake City, UT 84123

Pioneer Museum Fire Alarm Upgrade
Post-Bid
Salt Lake City, UT

DFCM Construction-UNG Camp Williams Deluge System
Results
$207,000 est. value
Bluffdale, UT 84065

GTI Annex, Fire Sprinkler Project
Post-Bid
Salt Lake City, UT 84115

Construction: Westbrook Elementary, Fire Alarm Upgrade
Results
Less than $100,000 est. value
Taylorsville, UT 84129

Fire Alarm System Inspections
Post-Bid
Huntington, UT

Westpointe SSB Fire Suppression System Installation
Results
Less than $250,000 est. value
Salt Lake City, UT 84116

North Park Elementary CO Detection and Fire Alarm Upgrade
Post-Bid
North Logan, UT 84341

Gamewell Fire Alarm System
Term Contract
Results
West Jordan, UT

South Cache Home Economics Fire Alarm System
Post-Bid
Hyrum, UT 84319

Last Updated 06/16/2021 08:48 AM
Project Title

North Cache Middle School CO Detection and Fire Alarm

Physical Address View project details and contacts
City, State (County) Richmond, UT 84333   (Cache County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results, No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Addition of new CO detectors, relays for shutdown of gas burning appliances, power supplies, blue strobe notification device and fire alarm system devices in the North Cache Middle School. The existing fire alarm control panel will be upgraded to a new Notifier 3030 panel and will network via fiber with a new fire alarm control panel in the Woodshop building as well as the Classroom addition building and with the existing fire alarm control panel in the Vocational building. A new single mode fiber circuit is required to be ran to connect all the building fire alarm control panels together. The existing annunciators, field initiating devices and power supplies in the main building, classroom building and woodshop building are to be replaced. The existing fire alarm notification devices will remain and will communicate with the new fire alarm control panels. The CO detectors to be added will have a local sounder alarm for the space where CO is detected and the blue strobe in the office area will activate to notify personnel that CO has been detected. New 24v power circuits are to be ran in conduit from the added power supplies to each new CO detector base. New SLC (initiating) circuits are to be ran in conduit to the new CO detectors, monitor modules and control modules. New notification circuits are to be ran in conduit for the new blue strobe in the main office area and for added fire alarm horn strobes. Fire alarm relays will be programmed for shutting down the respective AHU’s or furnaces when CO is detected.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents