Similar Projects
Hot Mix Asphalt Cold Mill, Crush, Shape and Resurface, Concrete Curb and Ramps, Sewer and Pavement Markings on Lemon Creek Road
Infrastructure
Bidding
$396,000 est. value
Baroda, MI 49101

Traffic Signal Modernizations and Concrete Sidewalk Ramp Improvements on Various Routes
Infrastructure
Bidding
$1,272,000 est. value
Saint Joseph, MI

Entrance Drive Improvements
Infrastructure
Post-Bid
Niles, MI 49120

Lincoln Elementary Parking and Trail Improvements Project
Infrastructure
Post-Bid
Saint Joseph, MI

Snow Road Recreation Facility Project
Results
Berrien Springs, MI

Site And Parking Lot Improvement Project
Results
Three Oaks, MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Karen Court Paving and Sidewalk Project
Results
Stevensville, MI

2022 Lookout Park Parking Lot Repair Project
Infrastructure
Post-Bid
Saint Joseph, MI

Niles MSP-Parking Area Improvements
Results
Niles, MI 49120

CDBG Sidewalks Project
Alteration
Post-Bid
$350,000 est. value
Benton Harbor, MI

Rangeline Park Trailhead Development
Results
Berrien Center, MI

Office of Passenger Transportation - Multiple Solar Powered Facilities, Overhang and Sidewalks
Alteration
Post-Bid
$260,000 est. value
Benton Harbor, MI

Quanicassee River BAS - Improvements
Results

CDBG Sidewalk Improvements
Results
$142,000 est. value
Saint Joseph, MI

Last Updated 04/29/2022 10:51 AM
Project Title

2022 Sidewalk Replacement Project

Physical Address View project details and contacts
City, State (County) Saint Joseph, MI   (Berrien County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement designated sidewalk squares throughout the City but predominantly in the southeast section. Replacement sidewalk ramps throughout the City of St. Joseph. Replacement of a portion of the parking lot and sidewalk in the rear of City Hall

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents