Similar Projects
Last Updated | 06/16/2023 04:34 AM |
Project Title | Spray Foam Insulation at Existing 2nd Flr. Level Roof Bar Joist Extensions at District 5 Office |
Physical Address | View project details and contacts |
City, State (County) | Fairfield, IA 52556 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Close Date & Time 5/18/2023 02:00:00 PM (ET) Provide Spray Polyurethane Insulation (ccSPF) in cavities at existing roof bar joist extensions to seal air penetrations, located on 2nd Floor Level. Note: the existing space is an open ceiling design, so no conflict exist from a ceiling; Work shall be as indicated on drawings. The project period to begin is July 1st, 2023. Anticipated work end date: no later than Aug. 10st, 2023 Anticipated Final Acceptance: no later than Aug. 24th, 2023 Contractors will be required to bring their own equipment needed for the site visit. It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. This is a tax exempt project. IADOT - Spray Foam Insulation at Existing 2nd Flr. Level Roof Bar Joist Extensions at District 5 Office |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |