Similar Projects
RFQ Contractor - Fire Station Support Building
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Fort Carson, CO 80913

Nottingham Park Improvements
New Construction, Infrastructure - 3,400 SF
Design
$10,000 CJ est. value
Avon, CO 81620

2021 Concrete Replacement
Post-Bid
Breckenridge, CO

Managed Parking
Post-Bid
Green Mountain Falls, CO

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

Copper Ridge Connector Trail
Results
Loveland, CO

Balfour Senior Living Development
New Construction, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Fort Collins, CO 80528

Handicap Ramp Sidewalks Parking
Post-Bid
Lamar, CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

8th and Oak Parking Lot Dumpster Design and Construct
Post-Bid
Less than $50,000 est. value
Steamboat Springs, CO 80487

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Design Build for the Lake County Senior Center ADA Ramp
Post-Bid
Leadville, CO 80461

New Park at 88th Avenue and Santa Fe Drive
Results
$1,000,000 to $1,500,000 est. value
Thornton, CO 80260

Last Updated 08/05/2022 04:04 PM
Project Title

Bus Shelter Snow Maintenance

Physical Address View project details and contacts
City, State (County) Breckenridge, CO 80424   (Summit County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Breckenridge is seeking bids for the 2022 - 2023 winter season for snow maintenance operations at 26 Town bus shelters and 27 bus stops/bus pull outs. Snow plowing will be required when daily snow amounts equal or exceed 3. Plowing must be align with the below priority scheduling. This contract may run from November 1st, 2022 through April 30th, 2023. There will be no pre-bid meeting. Questions can be directed to Steve Worrall, Public Works Parks Assistant Manager via email prior to August 10th, 2022 at 5pm. Stevew@townofbreckenridge.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents