Similar Projects
Algonquin Corporate Center Buildings 1 & 2
New Construction
Conception
IL 60102

Twin Industrial Buildings
New Construction - 415,400 SF
Design
$10,000,000 CJ est. value
Elgin, IL 60123

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Belle Tire / Carpentersville
New Construction, Infrastructure - 12,925 SF
Bidding
$3,400,000 CJ est. value
Carpentersville, IL 60110

Resurfacing Project
Infrastructure
Bidding
$300,000 CJ est. value
Elgin, IL 60120

PIP-II Site Work
Post-Bid
Batavia, IL

Cemetery Services
Term Contract, Alteration
Post-Bid
Geneva, IL 60134

Solar Photovoltaic Systems Site Development and Operation
Infrastructure
Results
Saint Charles, IL

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

Speculative Industrial Building
New Construction - 207,000 SF
Construction
Batavia, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Light Manufacturing Facility
Renovation, Alteration - 6,000 SF
Pending Verification
Huntley, IL 60142

Industrial Park
New Construction - 1,000,000 SF
Pending Verification
$11,275,000 est. value
Valley View, IL 60174

Kehoe Park and Red Gate Park Playground Renovations
Infrastructure
Bidding
$1,423,000 CJ est. value
St Charles, IL 60174

EASD Site Improvements 2022
Infrastructure
Post-Bid
Aurora, IL 60505

Last Updated 07/28/2022 10:36 AM
Project Title

Elgin Distribution Center

Physical Address View project details and contacts
City, State (County) Elgin, IL 60120   (Kane County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022, permits have been approved. An architect and general contractor have been selected. Information regarding subcontractor bidding opportunities has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. Completion is expected December 2022.

Details

477,115 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents