Similar Projects
New Orleans Sidewalk Improvements Aspen to Elm
Infrastructure
Bidding
$600,000 est. value
Broken Arrow, OK 74011

Albany Street Widening Phase II from 23rd Street to 37th Street
Infrastructure
Bidding
$2,700,000 est. value
Broken Arrow, OK 74011

Owasso 5K Heart Healthy Trail
Infrastructure
Post-Bid
Owasso, OK 74055

Savage/Carl Smith Park Improvements
Renovation
Post-Bid
Tulsa, OK 74134

37th Street Park Construction
New Construction
Results
Less than $726,334 est. value
Broken Arrow, OK 74014

Chandler Park Lower Level Overlook Plaza
Alteration
Results
Tulsa, OK 74107

North of Market ( NOMA) - Mixed Use Development
New Construction, Demolition - 463,381 SF
Pending Verification
$60,000,000 est. value
Tulsa, OK 74129

Sidewalk and Curbramp Construction for CDBG/HUD Grant
Infrastructure
Post-Bid
Tulsa, OK 74107

War at Home Memorial
New Construction, Alteration
Results
$278,541 est. value
Broken Arrow, OK 74012

OSU Medical Research Secured Parking Lot
Demolition, Infrastructure
Post-Bid
Tulsa, OK 74136

River West Park Improvements
Renovation
Results
Tulsa, OK

Vision Tulsa McCullough Park Improvements
Infrastructure
Results
OK

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

Collinsville Park Improvements
New Construction
Results
Collinsville, OK

Cedar Springs Estates Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work
Infrastructure, Alteration
Results
$1,115,000 est. value
Broken Arrow, OK

Last Updated 01/21/2022 09:16 AM
Project Title

Jackson Park Restroom and Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a new restroom facility to serve the north end of Jackson Park. The construction includes all water and sewer tie-ins for accessible restrooms that will have two stalls in the women’s and one stall and one urinal in the men’s, as well as exterior water fountains. The parking lot expansion will add to the existing parking lot and will increase the lot size from 53 to 83 parking spaces.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents