Similar Projects
Last Updated | 07/18/2023 11:38 AM |
Project Title | Southern NHC Regional Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, NC 28403 (New Hanover County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,905,475 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Estimate : $5M - $ 5.5M. This is a single prime contract. Bid Bond: A deposit is required with the submission of the bid. When a deposit is required, the bidder must submit with the bid cash or a certified check, drawn on a bank or trust company authorized to do business in the State of North Carolina, payable to Cape Fear Public Utility Authority, in an amount at least equal to five percent (5%) of the total amount of the bid, as a guarantee that a contract will be entered into and that satisfactory performance and payment bonds will be executed. In lieu of making the cash deposit above described, a satisfactory bid bond in the amount of five percent (5%) of the total bid, executed by a corporate surety licensed under the laws of the State of North Carolina to execute such bonds, shall be submitted with each bid, conditioned that the surety will upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. This deposit shall be retained if the successful bidder fails to execute the contract within ten (10) days after the award of the bid or fails to give satisfactory surety as required in North Carolina General Statutes Section 143-129 Affidavit and Certification of Non-Collusion, Non-Suspension and Non-Conviction: The Affidavit and Certificate of Non-Collusion, Non-Suspension and Non-Conviction provided with bid documents must be completely executed and submitted with bid. Each bidder must show evidence that it is licensed as a contractor under Chapter 87 of the North Carolina General Statutes. The bidder must have the following NC General Contractor's license to be qualified to perform the work associated with this bid: Limitation: Unlimited Classification(s): Public Utility No bid may be withdrawn after bids have been opened, except as provided in the North Carolina General Statutes. The successful bidder will be required to furnish a construction performance bond and a construction payment bond as security in the amount of one hundred percent (100%) of the contract amount for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. If the bidder fails to complete and submit all requirements stated in this Advertisement for Bids and those further requirements stated in the Instruction to Bidders included with the relevant contract documents, the Cape Fear Public Utility Authority may deem such failure nonresponsive and therefore a forfeiture of the bid. Cape Fear Public Utility Authority reserves the right to reject any and all bids All inquiries concerning this bid shall be directed to CFPUA Purchasing Division by e-mail to bids@cfpua.org. GENERAL DESCRIPTION OF WORK. A. The Work to be performed under these Contract Documents is generally described as follows: 1. Construction of the new Southern New Hanover County (NHC) Regional Pump Station with two (2) self-priming centrifugal pumps, fiberglass pump enclosure, precast wetwell, precast flow meter vault, electrical building, standby engine-generator, and miscellaneous yard structures and site work. 2. Furnish and installation of influent force mains consisting of approximately 2,000 linear feet of 10-inch sewer, 2,700 linear feet of 8-inch sewer, and 200 linear feet of 8-inch sewer to connect three existing pump stations to the Southern NHC Regional Pump Station. 3. Furnish and installation of discharge force main consisting of approximately 10,000 linear feet of 16-inch sewer from the new Southern NHC Regional Pump Station to the CFPUA Motts Creek Pump Station No. 69. The project will include pipeline installation using both open cut and trenchless methods. 4. The project generally includes, but is not limited to, all clearing, grading, erosion control, cleaning, testing, and all other work necessary to furnish, install, test, and place into service the Southern NHC Regional Pump Station and its associated influent and effluent force mains in Wilmington, North Carolina. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |