Similar Projects
Ellis Estates
New Construction, Infrastructure
Conception
$15,750,000 CJ est. value
Fayetteville, AR 72703

Nazareth Retreat Center - Phase 1
New Construction, Infrastructure - 13,112 SF
Conception
$3,375,000 CJ est. value
Fayetteville, AR 72701

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

RFQ Contractor - Construct New Water Storage Facility
Demolition, New Construction, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Fayetteville, AR 72703

RFQ Contractor - Correct Security Deficiencies
Infrastructure
Bidding
$300,000 CJ est. value
Fayetteville, AR 72703

Viney Grove Road - Phase I improvements
Infrastructure
Post-Bid
Prairie Grove, AR 72753

Multi-User Silicon Carbide National Research Fabrication Laboratory (MUSiC Lab) - University of Arkansas-Fayetteville
New Construction, Infrastructure
Post-Bid
$23,000,000 CJ est. value
Fayetteville, AR 72701

Richmond Road Surfacing
Infrastructure
Results
Farmington, AR 72730

North 40th Street Improvements
Infrastructure
Results
Springdale, AR 72762

University of Arkansas Anthony Timberlands Center for Design and Materials Innovation
LEED Certification, New Construction, Infrastructure - 45,000 SF
Construction
$26,500,000 CJ est. value
Fayetteville, AR 72701

Lewis Automotive Mall
New Construction, Infrastructure - 89,946 SF
Construction
$20,000,000 CJ est. value
Fayetteville, AR 72704

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Nazareth Retreat Center - Phase 2
New Construction, Infrastructure - 14,880 SF
Conception
$1,500,000 CJ est. value
Fayetteville, AR 72701

Last Updated 02/01/2023 05:08 PM
Project Title

Push Plastic Addition

Physical Address View project details and contacts
City, State (County) Springdale, AR 72764   (Washington County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 1, 2023 the project is in planning stage. The City of Springdale Planning Commission approved a large scale development plan and a waiver on January 3, 2023. Information regarding the architect, general contractor and method of selection has not been released. A construction timeline has not been determined, but may begin in the spring of 2023.

Details

1 Story Above Grade, 10,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents