Similar Projects
Broadstone at Portland
New Construction - 266,555 SF
Conception
$10,000,000 CJ est. value
Phoenix, AZ 85003

Chandler 101
New Construction
Conception
Chandler, AZ 85226

The Hayden
New Construction - 264,210 SF
Design
$10,000,000 CJ est. value
Tempe, AZ 85281

100 Mill Office
New Construction - 296,000 SF
Design
$7,500,000 est. value
Tempe, AZ 85281

Parking Garage Expansion - Phoenix, AZ Project Number - 644-237
New Construction
Bidding
$10,000,000 to $20,000,000 est. value
Phoenix, AZ

The Grand at Papago Park - Site & Parking Structure
New Construction
Bidding by Invitation
Tempe, AZ 85281

Watermark at Gilbert Town Square / The Wyatt by Watermark
New Construction - 1,269,864 SF
Sub-Bidding
Gilbert, AZ 85296

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Regency Parking Garage Disposition and Redevelopment
Results
Phoenix, AZ 85040

The Grid
New Construction, Renovation - 440,000 SF
Construction
$75,000,000 est. value
Mesa, AZ 85201

Canopy by Hilton
New Construction - 207,810 SF
Construction
$10,000,000 CJ est. value
Scottsdale, AZ 85250

Aura Midtown Apartment
New Construction - 450,600 SF
Pending Verification
Phoenix, AZ 85012

Medimpact Garage
New Construction - 28,560 SF
Pending Verification
Tempe, AZ 85284

Optima 15615
New Construction
Conception
Scottsdale, AZ 85254

48th Street Parking Garage
New Construction
Design
Tempe, AZ

Reported 02/06/2019 12:00 AM
Project Title

Y--Parking Garage Expansion - Phoenix, Az

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The purpose of this project is to improve veteran s experience at the Phoenix Veterans Administration Health Care System by increasing 400 parking spaces to the current available on-site parking. Feasibility efforts have determined the optimal option to achieve this goal is to expand the existing PVAMC parking garage and improve the overall efficiency of the combined structure. The existing structure was designed for future expansion, where mandrel connections can be placed on the west and north faces. Due to space constraints, it has also been determined that the north end expansion be built over a future underground storm water detention basin. Improvements to the current PVAMC storm water system are being addressed in a separate design project, but the design will not be complete by the time construction for the parking garage expansion will begin. Retention basin 1 (RB1) is where a majority of the campus storm water collects and is the location of the planned underground storm water storage tanks. RB1 frequently overfills since it does not percolate as expected by design. This causes flooding to numerous areas of the campus and requires grounds crews to manually pump water to other areas. It is critical that the underground storm water storage at RB1 be designed and built to detain storm water with a positive connection to the City of Phoenix (COP) storm water system prior to, or during, the construction of the parking garage expansion by the parking garage expansion design-build team. The contractor shall provide the complete design and subsequent construction of expanding the parking garage and storm water detention basin.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents